Technical evaluation result for Consultancy Service for Authority’s Engineer for (i) Construction/upgradation of existing road to 2-lane with paved shoulder including geometric improvement from Ranipool to Pakyong from Km. 0.000 to Km. 16.167 of NH-717-A
2019
Size: 396.75 KB
2
Opening of Financial For Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur.20-12-2019.
2019
Size: 345.08 KB
3
Technical evaluation result for Restoration/reconstruction of road churachandpur km 0.00 to songpi km 7.10 on churachandpur-tipaimukh road on NH-150 in the state of Manipur.Dated: 16-12-2019.
2019
Size: 360.63 KB
4
Technical evaluation result for Consultancy services for Authority Engineer for Supervision of Improvement/Widening to 2 Laning of Stretch from Khongsang to Tamenglong (Design Length=37.97 Km) of NH-137 in the State of Manipur on EPC Mode under SARDP-NE.
2019
Size: 591.36 KB
5
Technical evaluation result for Repair and Maintenance Tezu-Hayuliang Road from km 65.08 (Near Arrowa tri-junction) to km 96.00 (Near Swami Camp/Khupa) section of NH-113 in the state of Arunachal Pradesh. Dated: 18-11-2019.
2019
Size: 355.07 KB
6
evaluation result for Construction of valley side slope stabilization treatment including drainage, cross drainage work and pavement in Dharasu- Gangotri road from km. 123.080 to km 123.970 of NH-34 and stabilization of dumping zone in the state of Uttara
2019
Size: 270.03 KB
7
Opening of Financial proposal for Package-1 (NH-54) in the state of Mizoram.Dated: 01-11-2019.
2019
Size: 2.77 MB
8
Technical evaluation result for EOI for Authority’s Engineer Proposal for the work “Four-lane Bridge including approaches over river Brahmaputra between Dhubri on North Bank and Phulbari on South Bank on NH-127B (Design length 19.282 km) in the State of A
2019
9
Technical evaluation result for Authority’s Engineer for Widening to 2-lane with Geometric Improvements of Tura Dalu road from km 85.000 to 95.000 & 101.000 to 145.000 to 2-Lanes with paved shoulder of Tura–Dalu section of NH-51 in the State of Meghalaya
2019
Size: 386.72 KB
10
Technical evaluation result for Empanelment of Consultants for preparation of Feasibility Report, Architectural & Structural Design of Automated Car Parking System at various locations in India. Dated: 30-09-2019.