Sr. No Title Tender Date Document
1 Independent Engineer Services for Supervision of Construction of 4 (Four) Lane with Paved Shoulder for existing as well as Greenfield alignment (D. Ch. 87.700 Km to D. Ch. 106.500Km) of Chandkhira village – Churaibari section of NH-8 in the state of Assam on Hybrid Annuity Mode 20-12-2024 Size: 838.65 KB
2 Independent Engineer Services for Four Laning of Badarpur – Churaibari section of NH-37 & NH-8 from Design chainage 38.600 (End of proposed Badarpur Bypass) to Km. 62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV) on Hybrid Annuity Mode 20-12-2024 Size: 861.59 KB
3 Independent Engineer services for supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Near Mowatari, before Chapar Bypass) in the state of Assam on HAM mode 19-12-2024 Size: 1.24 MB
4 Independent Engineer services for supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 25.633 Km to Ch. 52.470 Km (Design Ch.21.850 Km to Ch.48.670 Km) for Package-2 of Bilasipura- Guwahati road (NH- 17) (Section: Near Mowatari, before Chapar Bypass to Tulungia (junction with NH-117)) in the state of Assam on Hybrid Annuity Mode 19-12-2024 Size: 1.34 MB
5 RFP for Independent Engineer services for supervision of Construction of 4 (Four) Lane of Karimganj – Sutarkandi section of NH-37 from Design Chainage 0.020 (Start of proposed Karimganj Bypass from NH-8) to Km. 14.380 (Sutarkandi) section of NH-8 in the state of Assam on Hybrid Annuity Mode” Package: VII (Project Length – 14.36km) 18-12-2024 Size: 812.48 KB
6 Restoration & repair of Dranga-Goha-Khellani road (3.5 m wide) by way of construction & installation of Road safety item viz. premix carpet, retaining wall, breast wall, Drain, Causeway, Landslide, Snow clearance, Abutment for Bailey suspension bridge, etc. from existing Km 0.000 to Km 29.800 on Goha Khellani stretch in the UT of Jammu & Kashmir for the FY 2024- 25 17-12-2024 Size: 602.31 KB
7 RFP for Independent Engineer services for supervision of Construction ofConstruction of 4-lane of NH-8 form Design Ch. 62.800 (start of proposed Nilambazar/Cheragi Bypass) to Design Ch. 87.700 near Chandkhira Village on Silchar-Churaibari Pkg-5 in the state of Assam on Hybrid Annuity Mode 11-12-2024 Size: 919.28 KB
8 One Time Improvement of Tulungia – Jogighopa section of NH-17 (Old-NH-31B) from Km 1.297 to Km 1.673, Km 11.415 to Km 18.321 and Km.19.36 to Km.19.69 (Length- 7.612 kms) in the State of Assam in FY-24-25 10-12-2024 Size: 261.54 KB
9 Consultancy Services as AE for Supervision of Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (P-2) on Sairang – Phaibawk section of NH-6 in the State of Mizoram” 05-12-2024 Size: 322.45 KB
10 Consultancy Services as Authority’s Engineer for Supervision of:- (i) Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 46+704(Total length:46.704 km) of Zido –Singha section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode. (ii) Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 13+080(Total length:13.080 km) of Tuting –Zido section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode 04-12-2024 Size: 810.36 KB
11 Consultancy services for Authority’s Engineer for Supervision of: (i) 4-Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode, (ii) 4-Laning of NH-37 from Teliagaon to Rangagara (km 288.600 to km 297.000) in the state of Assam under SARDP-NE Phase-A on EPC mode, (iii) 4-Laning from Rangagara to Kaliabhor Tiniali from km 297.00 to km 315.315 of NH-37 on EPC basis, (iv) 4-Laning from Kaliabor Tinali to Dolabari section from Km 0.0 to Km 17.3 of NH 37-A including construction of new Brahmaputra bridge, (v) 4-Lane highw 03-12-2024 Size: 988.01 KB
12 Consultancy services for Authority’s Engineer for Supervision of following projects: (i) Improvement/Widening of National Highway No. 217 (Dainadubi-Darugiri Section) to Two lane with paved shoulder in the state of Meghalaya, from design Km 0+000 to Km 40+840 (= 40.840 Km) (existing Km 8+600 to Km 53+000 of Old NH-62) under Bharatmala Pariyojana (Lot-1) Pkg-1B on EPC mode & (ii) Improvement and Widening of National Highway No. 127B (Darugiri – Songsak – Williamnagar Junction Section) to two lane with paved shoulder from design Km 0+000 to Km 36+635 (Design Length= 36.635 Km) (existing Km 1 29-11-2024 Size: 3.26 MB
13 Independent Engineer services for supervision of Construction of Construction of 4-lane of NH-8 form Design Ch. 62.800 (start of proposed Nilambazar/Cheragi Bypass) to Design Ch. 87.700 near Chandkhira Village on Silchar-Churaibari Pkg-5 in the state of Assam on Hybrid Annuity Mode 25-11-2024 Size: 1.65 MB
14 Independent Engineer Services for 4 (Four) Laning and Greenfield alignment of Karimganj – Silchar section of NH-37 from Design chainage 0.000 (Near ISBT, Silchar bypass) to Km. 15.970 (Kalinagar Pt I on NH-37) in the state of Assam on HAM mode. Package –I (Length- 15.970 km) Assam on Hybrid Annuity Mode 25-11-2024 Size: 1.83 MB
15 Independent Engineer services for supervision of Construction of 4 (Four) Lane of Karimganj – Sutarkandi section of NH-37 from Design Chainage 0.020 (Start of proposed Karimganj Bypass from NH-8) to Km. 14.380 (Sutarkandi) section of NH-8 in the state of Assam on Hybrid Annuity Mode” Package: VII (Project Length – 14.36km) 21-11-2024 Size: 1.79 MB
16 Consultancy Services as Authority’s Engineer for Supervision of Construction of Intermediate Lane of Pango to Jorging Road from Design Km 0+000 to Design Km 40+000 (Design Length: 40.00 Km, Package-I, Greenfield Alignment) in the State of Arunachal Pradesh on EPC mode 20-11-2024 Size: 845.32 KB
17 Short Term Maintenance Contract from chainage 174.200 (Tizit) via Pentom Junction – Jaboka – Lahdoigarh – Namtola Charali (Assam), Total length of the said stretch is 4.3 km (Mon) in the State of Nagaland in the FY 2024-25 (Percentage Rate & work order basis) 19-11-2024 Size: 1.33 MB
18 Consultancy Services as Authority’s Engineer for Supervision of :- (i) Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 46+704(Total length:46.704 km) of Zido –Singha section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode. (ii) Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 13+080(Total length:13.080 km) of Tuting –Zido section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode 19-11-2024 Size: 1.99 MB
19 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION of Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0+000 to Ch. 53+040 (Total Design Length = 53.04 Km) of Tato to Manigong Section of NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC mode 13-11-2024 Size: 1.34 MB
20 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION of Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0+000 to Ch. 53+040 (Total Design Length = 53.04 Km) of Tato to Manigong Section of NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC mode. 06-11-2024 Size: 1.25 MB
21 Independent Engineer Services for Four Laning of Badarpur – Churaibari section of NH-37 & NH-8 from Design chainage 38.600 (End of proposed Badarpur Bypass) to Km 62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV) on Hybrid Annuity Mode 06-11-2024 Size: 2.06 MB
22 Independent Engineer services for supervision of Construction of 4 (Four) Lane with Paved Shoulder for existing as well as Greenfield alignment (D. Ch. 87.700 Km to D. Ch. 106.500 Km) of Chandkhira Village – Churaibari Section of NH-8 in the state of Assam on Hybrid Annuity Mode” (Package: VI) (Project Length – 18.80 km 06-11-2024 Size: 1.89 MB
23 Short Term Maintenance Contract of NH-39 (New NH-02) from Kohima to Mao Stretch (from Km 185.540 to Km 194.000) [Length=8.46 Km] in the State of Nagaland in the FY 2024-25” – Percentage Rate and Work Order Basis, at “Risk and Cost” of EPC Contractor 22-10-2024 Size: 359.43 KB
24 Short Term Maintenance Contract of NH39 New NH02 from Kohima to Mao Stretch from Km 194.000 to Km 212.334 Length 18.334 Km in the State of Nagaland in the FY 2024-25 Percentage Rate and Work Order Basis, at Risk and Cost of EPC Contract 22-10-2024 Size: 364.07 KB
25 Rectification of Black Spots /Accident Prone locations on Batote-Khellani Road stretch by Installation of Metallic Crash Barrier, Road Signages, raising of outer earthen shoulders etc., along with Clearance of landslide & Snow on NH-244 in the UT of Jammu & Kashmir in F.Y 2024-25 21-10-2024 Size: 7.92 MB
26 Consultancy services for Authority’s Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km 113+330 (Design KM 96+400 to Km 113+830) in the state of Assam on EPC mode 14-10-2024 Size: 427.06 KB
27 Independent Engineer services for supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Near Mowatari, before Chapar Bypass) in the state of Assam on HAM mode. 10-10-2024 Size: 3.52 MB
28 Consultancy Services as Authority’s Engineer for Supervision of Improvement & Widening of existing NH-08 from Champaknagar to Khayerpur to Four lane with paved shoulder (design Km 242+500 to Km 261+610) in the state of Tripura on EPC basis 10-10-2024 Size: 623.11 KB
29 Consultancy Services as Authority’s Engineer for Supervision of: i) Ukhrul bypass on NH-102A (Package-1, Length-6.571 km) ii) Finch Corner to Ukhrul section of NH-202 (Package-3, Length-14.63 km) & iii) Ukhrul to Choithar section of NH-202 (Package-4, Length-8.612 km) in the State of Manipur. 03-10-2024 Size: 592.08 KB
30 Independent Engineer services for supervision of Four laning of Silchar (near Nutan Dayapur village) – Budha Nagar Section under Package: SJ-1 of NH-37 from Existing km 260+000 (D. Ch.4+560) to Existing km 233+000 (D. Ch. 24+560) in the State of Assam under Bharatmala Pariyojna on Hybrid Annuity Mode 01-10-2024 Size: 2.03 MB
31 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION of:- (i) Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0+000 to Ch. 17.387 (Total Design Length = 17.387 Km) of Hunli to Ithun Bridge Section of NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC mode. (ii) Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0+000 to Ch. 53.00 (Total Design Length = 53.00 Km) of Hunli to Hyauliang (Package-I) Section of NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC mode 01-10-2024 Size: 1.17 MB
32 Consultancy services for Authority’s Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km 113+330 (Design KM 96+400 to Km 113+830) in the state of Assam on EPC mode 01-10-2024 Size: 400.47 KB
33 Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Near Mowatari, before Chapar Bypass) in the state of Assam on HAM mode 01-10-2024 Size: 3.82 MB
34 Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) Contract Basis 01-10-2024 Size: 626.55 KB
35 Construction of Balance Work of the 4- laning of Jamugurihat to end of Biswanath Chariali Bypass of NH- 15 from Km 182.000 to Km 208.000 (26 Km), under SARDP-NE, under EPC Mode at the Risk and Cost of EPC Contractor 23-09-2024 Size: 1.53 MB
36 Short Term Maintenance Contract of Peren-Dimapur Section on NH-129A from existing Km 120+500 to Km 123+380 [Design Km 120+320 to Km 123+200 (Length 2.88 Km)] in the state of Nagaland in FY: 2024-25- 4th Call 14-09-2024 Size: 636.5 KB
37 Consultancy Services as AE for Supervision of Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Pkg-2) on Sairang – Phaibawk section of NH-6 in the State of Mizoram 03-09-2024 Size: 425.02 KB
38 Construction of RCC Box Cell Viaduct by Box Pushing Method at chainage Km 157+200 to Km 157+500 along with other ancillary works on NH-29 in the State of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) Contract Basis 03-09-2024 Size: 688.64 KB
39 Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) Contract Basis 03-09-2024 Size: 737.98 KB
40 Short Term Maintenance Contract for Scaling of Hill Slope and Installation of Rock Fall Barrier in Pagla-Pahar, Dimapur Kohima road (PKG-I) from Km. 123.840 to 127.480 in the state of Nagaland in FY: 2024-25 (Percentage Rate and work Order Basis 03-09-2024 Size: 1.29 MB
41 Consultancy services for Authority’s Engineer for Supervision of Widening/Improvemenagt to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Packe 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km 113+330 (Design KM 96+400 to Km 113+830) in the state of Assam on EPC mode 29-08-2024 Size: 336.65 KB
42 Consultancy Services as Authority’s Engineer for Supervision of: i) Ukhrul bypass on NH-102A (Package-1, Length-6.571 km) ii) Finch Corner to Ukhrul section of NH-202 (Package-3, Length-14.63 km) & iii) Ukhrul to Choithar section of NH-202 (Package-4, Length-8.612 km) in the State of Manipur 28-08-2024 Size: 309.81 KB
43 Consultancy Services as Authority’s Engineer for Supervision of :- (i) Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 46+704(Total length:46.704 km) of Zido –Singha section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode. (ii) Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 13+080(Total length:13.080 km) of Tuting –Zido section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode. 28-08-2024 Size: 632.9 KB
44 Consultancy services for Authority’s Engineer for Supervision of following greenfield projects: (i) Construction of 2/4 Lane with paved shoulder of Shillong Western Bypass starting from near Ladumsaw (Existing km 60.900 of NH-40) to NH- 106 (OLD NH-44E), km 0+000 TO 12+800 (Package-1) under SARDP-NE ‘PHASE A’ in the State of Meghalaya on EPC Mode. (ii) Construction of 2/4 lane with paved shoulder of Shillong Western Bypass starting from near Ladumsaw (existing km 60.900 of NH-40) to NH-106 (old NH-44E), (Package-Il) km 12+800 to km 24+700 under SARDP-NE ‘Phase A’ in the State of Meghalaya on E 27-08-2024 Size: 519.62 KB
45 Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg- IV: Structures & Toll Plaza under SARDP- NE , under EPC Mode in the state of Assam. 09-08-2024 Size: 339.45 KB
46 Consultancy Services for Preparation of Detailed Project Report for Slope Protection and Slope Stabilization works including Rockfall Protection and Landslide Mitigation measures from km 123.840 to km 166.700 of NH-29 on 4-laning of Dimapur-Kohima Road under SARDP-NE in the State of Nagaland 08-08-2024 Size: 289.16 KB
47 Short Term Maintenance Contract of Dimapur-Kohima Section on NH-29 from old chainage Km 134.650 to Km 134.800 [New Chainage Km 31.462 to Km 31.612 (Length 0.15 Km)] in the state of Nagaland in FY: 2024-25 08-08-2024 Size: 418.09 KB
48 Balance work for Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Srirampur (near Bhairiguri Village) to Kachukhana Harichara Paglagaunj (Package-I) of Srirampur – Dhubri Section of NH-127B from existing Km 0.000 to Km 28.050 (Design Km 0.000 to Km 27.650), (Design Length=27.650 Km) on EPC Mode in the State of Assam under JICA – ODA loan assistance 06-08-2024 Size: 449.17 KB
49 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP (ii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 163.592 to Km 173.850 (Length – 10.258 Km) in the state of Nagaland on EPC mode (Pkg – IV) under NH (O) – TSP (iii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH-129A from Design Km 173. 31-07-2024 Size: 405.28 KB
50 Expression of Interest (EOI) for short listing of Consultants for Authority’s Engineer JICA ODA Phase-VI in the state of Tripura 15-07-2024 Size: 913.11 KB
51 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “Construction of 2nd Tube Uni-directional Zojila Tunnel (13.14 km) from D.ch. 16.80 to D.Ch. 30.50 of NH-1 in the under UT of Jammu & Kashmir – 2nd Call – Final result of Technical Evaluation 24-06-2024 Size: 531.72 KB
52 Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-I: Road Works from Km 490+800 to Km 501+800 (11.000 Km), under SARDP- NE, under EPC Mode – Result of Technical Evaluation 10-06-2024 Size: 997.55 KB
53 Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-II: Road Works from Km 501+800 to Km 514+800 (13.000 Km), under SARDP- NE, under EPC Mode – Result of Technical Evaluation 10-06-2024 Size: 1.1 MB
54 Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-III: Road Works from Km 514+800 to Km 534+800 (20.000 Km), under SARDP- NE, under EPC Mode – Result of Technical Evaluation 10-06-2024 Size: 835.6 KB
55 Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-IV: Structures & Toll Plaza, under SARDP- NE, under EPC Mode – Result of Technical Evaluation 10-06-2024 Size: 894.59 KB
56 Result of Technical Evaluation for Construction of Major bridge at Design Ch. 28+200 of Hunli-Anini Road (NH-313) in the State of Arunachal Pradesh on EPC Mode under SARDP(2nd Call) 10-06-2024 Size: 548.85 KB
57 Consultancy Services for Preparation of Detailed Project Report for intermittent Two Lane plus Paved Shoulder stretches to Four Lane in between Design Km 148+589 (Existing Km 235+070) (Vailoo) to Design Km 176+532 (Existing Km (263+070) Donipawa of 8.643 Km Length on Khellani-Khanabal Section of NH-244 in the UT of Jammu and Kashmir – Result of Technical Evaluation 04-06-2024 Size: 316.98 KB
58 Consultancy Services for Preparation of Detailed Project Report for intermittent Two Lane plus Paved Shoulder stretches to Four Lane in between Design Km 148+589 (Existing Km 235+070) (Vailoo) to Design Km 176+532 (Existing Km (263+070) Donipawa of 8.643 Km Length on Khellani-Khanabal Section of NH-244 in the UT of Jammu and Kashmir – Result of Technical Evaluation 04-06-2024 Size: 316.98 KB
59 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i)4-laning of Dimapur – Kohima Road from design km 123.840 to km 138.775 (Existing km 124.100 to km 140.000) (Package-I), (ii) 4-laning of Dimapur – Kohima Road from design km 138.775 to km 152.490 (Existing km 140.000 to km 156.000) (Package-II), (iii) 4-laning of Dimapur – Kohima Road from design km 152.490 to km 166.700 (Existing km 156.000 to km 172.900) (Package-III) & (iv) Associated works viz specialized slope protection works, Box Tunnelling using cast-in situ and box pushing methods and ancillary works; excluding Dimap 15-05-2024 Size: 454.87 KB
60 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP (ii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 163.592 to Km 173.850 (Length – 10.258 Km) in the state of Nagaland on EPC mode (Pkg – IV) under NH (O) – TSP (iii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH-129A from Design Km 173. 15-05-2024 Size: 436.75 KB
61 Technical Evluation Result for Construction for Mitigation Measures of 05 Nos. Landslides, 05 Nos. Sinking Zones and 1 no. Bridge from Ch. 450.00 to Ch. 468.00 (18 Km. length) on NH-07 on EPC mode in the State of Uttarakhand (Package-III). 09-03-2024 Size: 351.07 KB
62 Technical Evaluation Result for Construction for Mitigation Measures of 05 Nos. Landslides, 05 Nos. Sinking Zones from Ch. 433.00 to Ch. 450.00 (17 Km. length) on NH-07 on EPC mode in the State of Uttarakhand (Package-II). 09-03-2024 Size: 364.04 KB
63 Technical Evaluation Result for Construction for mitigation measures of 10 nos. of Landslides, 01 no. Sinking Zone and 01 no. minor bridge from Km 386.000 to Km 433.000 (65 km length) on NH-07 on EPC mode in the State of Uttarakhand, PKG-I. 09-03-2024 Size: 369.91 KB
64 Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Pradesh on EPC Mode. 09-03-2024 Size: 485.43 KB
65 Technical Evaluation Result for Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Package-2) on Sairang – Phaibawk section of NH-6 in the State of Mizoram on EPC Mode.. 08-03-2024 Size: 690.29 KB
66 Technical Evaluation Result for Widening/Improvement to 4 lane with paved shoulder from Ch. 5.580 km to Ch. 25.633 km (Design Ch. 0.000 km to Ch. 17.737 km) for Package-1 of Bilasipura – Guwahati Road (NH-17) (Section: Near Chirakuta to near Mowatari, before Chapar Bypass) in the state of Assam on HAM mode – Result of Technical Evalaution 07-03-2024 Size: 774.34 KB
67 Technical Evaluation Result Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-I) from Design Km 0.000 to Km 53.000 (Design Length 53.000 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Pradesh on EPC Mode 07-03-2024 Size: 428.03 KB
68 Technical Evaluation Result for Four laning of Badarpur – Churaibari section of NH-37 & NH-8 from Design Chainage 38.600 (End of proposed Badarpur Bypass) to km 62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV) on Hybrid Annuity Mode 05-03-2024 Size: 407.06 KB
69 Technical Evaluation Result for Construction of Four Laning of Mualkhang – Sairang Section (Package 8) of NH-6 from existing chainage km142+000 to km158+900 (Design Chainage km 123+400 to km 136+260) on Silchar-Vairengte – Sairang road in the state of Mizoram on EPC mode 04-03-2024 Size: 1.2 MB
70 Technical Evaluation Result for Construction of Intermediate Lane Road with hard shoulder from design chainage Km 0.000 to Km 17.387 (Total length 17.387 km) of Hunli to Ithun Bridge section on NH-913 (Frontier Highway) in State of Arunachal Pradesh” on EPC mode under NH(O) 02-03-2024 Size: 323.22 KB
71 Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Basam-Thathi-Amaha and Bruni-Lama Camp-Kangri’ Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length: 86 Km) (Package-V) 01-03-2024 Size: 520.51 KB
72 Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Pradesh on EPC Mode 29-02-2024 Size: 615.05 KB
73 Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Pradesh on EPC Mode Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Pradesh on EPC Mode Technical Evaluation Result for Construction 28-02-2024 Size: 2.31 MB
74 Technical Evaluation Result for Construction of Balance Work of 4-laning of NH-37 from End of Moran Bypass (561.700) to Bogibeel Junction near Lapetketa (580.875): Pkg-II: Structures, under SARDP-NE 27-02-2024 Size: 221.8 KB
75 Technical Evaluation Result for Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 13+080(Total length:13.080 km) of Tuting Zido section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode Project on EPC basis 27-02-2024 Size: 379.69 KB
76 Technical Evaluation Result for for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-I) from Design Km 0.000 to Km 53.000 (Design Length 53.000 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Pradesh on EPC Mode. 27-02-2024 Size: 1.08 MB
77 Technical Evaluation Result for Construction of Balance Work of 4-laning of NH-37 from End of Moran Bypass (561.700) to Bogibeel Junction near Lapetketa (580.875): Pkg-I: Road works & Toll Plaza, under SARDP-NE 26-02-2024 Size: 270.3 KB
78 Technical Evaluation Result for Widening/Improvement to 2-lane with earthen shoulder of Finch Corner to Ukhrul section from existing km 34+650 to km 50+520 (Design Chainage km 30+970 to km 45+600) of NH-202 in the State of Manipur on EPC mode. (Package-3, Length-14.63 km) 26-02-2024 Size: 666.73 KB
79 Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Near Mowatari, before Chapar Bypass) in the state of Assam on HAM mode 21-02-2024 Size: 1.27 MB
80 Technical evaluation Result for 4 (Four) Laning and Greenfield alignment of Karimganj – Silchar section of NH-37 from Design chainage 0.000 (Near ISBT, Silchar bypass) to Km. 15.970 (Kalinagar Pt I on NH-37) in the state of Assam on HAM mode. Package –I (Length- 15.970 km) 21-02-2024 Size: 553.14 KB
81 Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99 km in the State of Meghalaya for execution on EPC mode under JICA funding – (Package-V)-Balance Work 21-02-2024 Size: 381.42 KB
82 Technical Evaluation Result for 4-lane of NH-8 form Design Ch. 62.800 (start of proposed Nilambazar/Cheragi Bypass) to Design Ch. 87.700 near Chandkhira Village on Silchar-Churaibari Pkg-5 in the state of Assam on Hybrid Annuity Mode 20-02-2024 Size: 388.11 KB
83 Technical Evaluation Result for 4-L of NH 37 from design Ch 0+000 on NH -8 near Karimganj to design Chainage 14+250 near Sutarkandi (Spur Connectivity to Indo/Bangladesh Border) Silchar-Churaibari Pkg-7 in the State of Assam 20-02-2024 Size: 392.23 KB
84 Technical Evluation Result for Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Package-2) on Sairang – Phaibawk section of NH-6 in the State of Mizoram on EPC Mode 20-02-2024 Size: 3.54 MB
85 Technical Evaluation Result for Four Laning of Silchar – Churaibari section of NH-37 & NH-8 from Design chainage 38.600 (End of proposed Badarpur Bypass) to Km. 62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV) on Hybrid Annuity Mode 20-02-2024 Size: 497.59 KB
86 Technical Evaluation Result for Construction of Balance Work of 4-laning of NH-37 from End of Moran Bypass (561.700) to Bogibeel Junction near Lapetketa (580.875): Pkg-II: Structures, under SARDP-NE 19-02-2024 Size: 286.53 KB
87 Technical Evaluation Result for Four laning of Silchar (near Nutan Dayapur village) – Budha Nagar Section under Package: SJ-1 of NH-37 from Existing km 260+000 (D. Ch.4+560) to Existing km 233+000 (D. Ch. 24+560) in the State of Assam under Bharatmala Pariyojna on Hybrid Annuity Mode 14-02-2024 Size: 525.94 KB
88 Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 25.633 Km to Ch.52.470 Km (Design Ch.21.850 Km to Ch.48.670 Km) for Package-2 of Bilasipura- Guwahati road(NH-17) (Section: Near Mowatari, before Chapar Bypass to Tulungia (junction with NH-117)) in the state of Assam on Hybrid Annuity Mode. 14-02-2024 Size: 586.8 KB
89 Technical Evaluation Result Slope protection works for the work of Construction of Four Lane Dimapur — Kohima Road from design km 152.490 to km 166.700 (Existing km 156.000 to km 172.900) Excluding Dimapur & Kohima Bypass, in the state of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) Contract Basis 13-02-2024 Size: 452.69 KB
90 Technical Evaluation Result for Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) Contract Basis. 12-02-2024 Size: 731.03 KB
91 Technical Evaluation Result for Construction of RCC Box Cell Viaduct by Box Pushing Method at chainage Km 157+200 to Km 157+500 along with other ancillary works on NH-29 in the State of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) Contract Basis. 12-02-2024 Size: 1.13 MB
92 Technical Evaluation Result for Construction of Major bridge at Design Ch. 28+200 of Hunli-Anini Road (NH-313) in the State of Arunachal Pradesh on EPC Mode under SARDP-NE 05-02-2024 Size: 550.74 KB
93 Technical Evaluation Result for Construction of Balance works of Major Bridge over Middle Strait Creek between Km. 106.590 to km 108.553 of NH-04 connecting South Andaman &Baratang Island in the Union Territory of Andaman & Nicobar Islands on EPC Basis (3rd Call) 01-02-2024 Size: 496.84 KB
94 Technical Evaluation Result for Four laning of Silchar (near Nutan Dayapur village) – Budha Nagar Section under Package: SJ-1 of NH-37 from Existing km 260+000 (D. Ch.4+560) to Existing km 233+000 (D. Ch. 24+560) in the State of Assam under Bharatmala Pariyojna on Hybrid Annuity Mode 01-02-2024 Size: 602.19 KB
95 Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 25.633 Km to Ch. 52.470 Km (Design Ch.21.850 Km to Ch.48.670 Km) for Package-2 of Bilasipura- Guwahati road (NH- 17) (Section: Near Mowatari, before Chapar Bypass to Tulungia (junction with NH-117)) in the state of Assam on Hybrid Annuity Mode 31-01-2024 Size: 1.29 MB
96 Result of Technical Evaluation for Improvement and Widening to two lane with paved shoulder of road from existing Km 438.170 (Khowai Chowmuhani) to existing Km 439.410 (South Pulinpur) of NH-08 and from design Km 0.000 (South Pulinpur) to design Km 36.00 (near Rangamati) of NH 208 on Khowai – Teliamura- Harina section (Total length 37.24) (Package-II) in the state of Tripura on EPC mode under JICA ODA Loan Phase-6 22-01-2024 Size: 644.76 KB
97 Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of road from design Km 72.000 (Pati Chhari) to design Km 107.654 (Harina) (Total length 35.654 Km) on Teliamura to Harina section of NH 208 (Package-IV) in the state of Tripura on EPC mode under JICA ODA Loan Phase 6 19-01-2024 Size: 549.45 KB
98 Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of road from design Km 36.000 (Rangamati) to design Km 72.000 (Pati Chhari) (Total length 36.000 Km) on Teliamura to Harina section of NH 208 (Package –III) in the state of Tripura on EPC mode under JICA ODA Loan Phase-6 18-01-2024 Size: 558.98 KB
99 Technical Evaluation Result for Improvement and Widening to Two Lane with paved shoulder of road from Km 101.300 to km 127.319 (Total Length 26.019 Km) i.e. the Khowai –Teliamura section of NH 208 (Package I) in the state of Tripura on EPC under JICA ODA Loan Phase –VI 18-01-2024 Size: 539.36 KB
100 Technical Evaluation Result for Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 46+704(Total length:46.704 km) of Zido –Singha section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode 15-01-2024 Size: 590.42 KB
101 Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/Manipur Border) at km 96.870 and ending near Hangrum at km 116.550 (Package – 7) on EPC mode. (Length-19.68 km) 01-01-2024 Size: 597.51 KB