KOPILI HYDRO POWER STATION (KHPS)

Energy Assets Imgae
Kopili Hydro Power Station
Category Page assets
id
1
Location Assets
Umrongso, District-Dima Hasao, Assam
Total Capacity(MW)
275
Status
Completed Date
Installed Capacity(MW)
200 + 50 + 25
Introduction

Introduction

Kopili Hydro Power Station was the maiden venture of NEEPCO when it came into existence in 1976.

The Kopili Hydro Power Station is a storage scheme with two Dams to harness the hydro power of Kopili River ( a tributary of Brahmaputra River) and the Umrong stream (a tributary of Kopili River). There are two Dams, one is the Khandong Dam that receives the inflow of Kopili River and the other is the Umrong Dam that receives the inflow of the Umrong stream and also receives the tailrace discharge of Khandong PS & Khandong Stage II PS. The Station is located at Umrangso, Dima Hasao District, Assam. The installed capacity of the Station is 275 MW with a catchment area of 1256 Sq. Km and design head of about 99 m for Khandong PS (50 MW) & Khandong Stage II PS (25 MW) and 326.5 m for the Kopili PS (200 MW).

R&M of 200 MW Kopili Power Station  and 50 MW Khandong Power Station

The Renovation and Modernisation of 200 MW Kopili Power Station is completed on 03.06.2024. The revised annual design energy is 993.8 MU in a 90 % dependable year.  

The Renovation and Modernisation of 50 MW Khandong Power Station is completed on 30.08.2025. The revised annual design energy is 217 MU in a 90 % dependable year. 

Features

Features

Kopili Hydro Power Station (KHPS)
NameKopili Hydro Power Station (KHPS)
Capacity275 MW
Break Up Capacity
  1. KOPILI POWER STATION - 200 MW (4x50MW)
  2. KHANDONG POWER STATION - 50 MW (2x25MW)
  3. KHANDONG STAGE-II- 25 MW (1x25MW)
LocationUmrongso, District-Dima Hasao, Assam, PIN - 788931
ApproachBy Road - 140 Km from Shillong, 70 Km from Lanka Railway Station in Assam
Design Energy
Kopili Power Station = 993.8 MU
Khandong Power Station = 217 MU
Khandong Stage-II=75 MU
Original Date of Commercial Operation (COD)
Khandong Unit-I --- 07.03.1984
Khandong Unit-II --- 04.05.1984
Kopili Unit-I --- 05.07.1988
Kopili Unit-II --- 22.06.1988
Kopili Unit-III --- 01.05.1997
Kopili Unit-IV --- 12.07.1997
Khandong Stg-II --- 26.07.2004
Date of Commercial Operation (COD) after Renovation & Modernization
Khandong Unit-I --- 13.07.2025
Khandong Unit-II ---30.08.2025
Kopili Unit-I --- 03.06.2024
Kopili Unit-II --- 12.11.2023
Kopili Unit-III --- 03.09.2023
Kopili Unit-IV --- 20.08.2023
Beneficiary States / UTsAssam, Arunachal Pradesh, Manipur, Meghalaya, Mizoram, Nagaland, Tripura
Technical Features
KOPILI POWER STATION
Dam
Type::Concrete Gravity
Height::30 m
Length::143 m
Tunnel

LP tunnel 4.6 m dia, 5.5 km long concrete lined.

HP tunnel 4.6 m dia 825.0 m long concrete liner & 4.0 m dia 300 m long steel liner

PenstockTwo nos. 2.7 m dia 890 m long bifurcated into 2 m dia, 43 m long steel liner.
Design Head326.50 m
Generator Step Up Transformer3-phase, 65 MVA, 11/220 KV
Switchyard220 KV Air Insulated Substation (AIS) & 132 kV Gas Insulated Substation (GIS)
Evacuation System:220 kV Kopili- Misa D/C Lines, 220 kV Kopili – Misa S/C Line, 132 kV Kopili-Khandong Two S/C Line.
KHANDONG POWER STATION & KHANDONG Stage-II POWER STATION
Dam
Type::Concrete Gravity
Height::66 m
Length::243 m
TunnelConcrete lined 4.5 m dia 2852 m long and 4.5 m dia 38 m steel lined. 221124
Penstock
  • Two nos. 2.5 m dia & 192 m long.
  • 3.2 m dia 275 m long and 2.5 m dia. 205 m long steel liner for stg-II
Design Head99 m
Generator Step Up Transformer3-phase, 28.5 MVA, 11/132 KV
Switchyard132 KV Air Insulated Substation (AIS)
Evacuation System:132 kV Khandong-Umrangso S/C Line
132 kV Khandong-Khliehriat Two S/C Lines
132 kV Khandong-Kopili Two S/C Lines
Achievements

Achievement

Kopili HPS was awarded the “Best O&M Plant” for FY 2024–25 recognizing its outstanding operational performance among all NEEPCO O&M plants. 

Khanding ST-II HPS achieved annual generation of 116.61 MU exceeding the Annual Target of 100 MU for FY 2025-26 as on 31.01.2026.

Status of Generation

Status of Generation

S.NoDescriptionGeneration (MU)Details
1Generation for the Month of May 202489.7109 MUGeneration for the month of May' 2024
2Total Generation from  April, 2023  upto  May, 2024553.4028 MUTotal Generation from  April, 2023  upto  May, 2024
3Total Generation during Financial Year  2022  to  2023MUGeneration during F/Y  2022  to  2023
Contact Person
Contact Person

Project Head

Shri Ashim Jyoti Bordoloi

Designation

Chief General Manager (Tech) / HOP

Telephone (O)

03670 288222, 9365291701

E-Mail

hopkhep[at]neepco[dot]co[dot]in, ashimjyoti[at]neepco[dot]co[dot]in
image banner
Kopili Hydro Power Station (KHPS)
Energy Assets Sr No
1
Map lat
25.5089
Map long
92.7369
Select map state
map icon
Kopili Hydro Power Station (KHPS)
Map Project name
Kopili Hydro Power Station (KHPS)