Location Assets
Monarchak, Sonamura, P.O. Dhanpur, District – Sepahijala, Tripura.
Installed Capacity(MW)
(1 x 65.42) Gas Turbine (1 x 35.58) Steam Turbine
Introduction
Introduction
This Combined Cycle project is located in the Sepahijala District of the state of Tripura around 60 Kms away from the capital town of Agartala. The project runs on Combined Cycle Mode and consists of one Gas Turbines of 65.42 MW & one Steam Turbine of 35.58 MW each of BHEL supplied operating on natural gas obtained from the gas fields of M/S ONGC. The Gas Turbine is presently in commercial operation w.e.f. 24/12/2015 and the Steam Turbine is commissioned for commercial operation w.e.f 31/03/2017.
Features
Features
| TRIPURA GAS BASED POWER STATION (TGBPS) |
|---|
| Name | TRIPURA GAS BASED POWER STATION (TGBPS) |
| Capacity | 101 MW |
| Break Up Capacity | |
| Location | Monarchak, Sonamura, P.O. Dhanpur, District – Sepahijala, Tripura.,Pin – 799181 |
| Approach | By Rail - 60 Km from Agartala railway station , By Road - 70 Km from capital city Agartala and 30 Km from District headquarter Bishramganj. |
| Design Energy | |
| Date of Commercial Operation (COD) | | GTG -- I : 24/12/2015 | | | STG -- II : 31/03/2017 | |
|
| Beneficiary States / UTs | Tripura |
| Technical Features | | Type of Fuel | Natural Gas | | Source of Fuel & quantity | Oil Fields of M/s ONGC in Tripura, 0.5 MMSCUMD | | Source of water for consumptive use | River Gomati | | Consumptive water requirement | 238 Cum/Hr | | Turbine type | Frame 6FA+ | | Generator type | 2 Pole Cylindrical Rotor, Indoor | | Evacuation System | 132 kV D/C TGBP – Rabindra Nagar Line & One 132 kV S/C Monarchak-Rokhia line of Govt. of Tripura |
|
Achievements
Achievement
- COD of the Gas Turbine Generator (65.42 MW) achieved on 24/12/2015.
- The commercial operation (COD) of 35.5 MW STG unit of 101 MW TGBP has been started w.e.f. 00:00 hrs. of 31.03.2017.
Status of Generation
Status of Generation
| S.No | Description | Generation (MU) | Details |
|---|
| 1 | Generation for the Month of May 2024 | 46.8500 MU | Generation for the month of May' 2024 |
| 2 | Total Generation from April, 2023 upto May, 2024 | 751.943 MU | Total Generation from April, 2023 upto May, 2024 |
| 3 | Total Generation during Financial Year 2022 to 2023 | 747.483 MU | Generation during F/Y 2022 to 2023 |
Contact Person
| Contact Person |
|---|
Project Head | Shri Gautam Gogoi |
Designation | General Manager (Tech) / HOP |
Telephone (O) | 0381 2391269, 9435339748 |
E-Mail | hoptgbpp[at]neepco[dot]co[dot]in, gautamgogoi[at]neepco[dot]co[dot]in |
Map Project name
Tripura Gas Based Power Station(TGBPS)