Generating Stations, Beneficiaries & Tariff:

Generating Stations, Beneficiaries & Tariff: 

Power StationInstalled Capicity (MW)Station CodNormative Tariff (Rs./kwh)Beneficiaries
Khandong Hydro Power Station(KhPS)2x25=5004.05.19841.828Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, and Tripura
Kopili Hydro Power Station(KHPS)4x50=20012.07.19972.350 (Provisional)
Khandong Stage-II Power Station(KhPS-II)1x25 =2526.07.20043.036
Doyang Hydro Power Station(DHPS)3X25=7508.07.20006.972
Panyor Lower Hydro Power Station (Formerly Ranganadi Hydro Power Station)(PLHPS)4x135=40512.04.20022.806
Pare Hydro Power Station(PHPS)2x55=11028.05.20185.342
Tuirial Hydro Power Station(THPS)2x30=6031.01.20185.098Mizoram
Kameng Hydro Power Station(KaHPS)4x150=60012.02.20214.00(Provisional)Arunachal Pradesh, Assam, Chhattisgarh, Haryana, Meghalaya, Nagaland and Uttar Pradesh 
Sub Total (Hydro)1525   
Agartala Gas Based Power Station (AgGBPS)4x21+2x25.5=13501.09.20151.935+ECRArunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland and Tripura
Assam Gas Based Power Station(AGBPS)6x33.5+3x30=29101.04.19991.936+ECR
Tripura Gas Based Power Station(TGBPS)65.42x1+35.58x1=10131.03.20172.533+ECRTripura
Sub Total (Thermal)527   
Monarchak Solar Power Station(MSPS)515.02.2015

1. 7.72 (for RPO portion)

2. Tripura’s APPC (for portion under REC mechanism)

Tripura
Sub Total (RE-Solar)5   
Grand Total2057   
  • Out of the total installed capacity of 600 MW of Kameng HPS, 259 MW is allocated to long term beneficiaries and 341 MW is allocated to NEEPCO as merchant power.
  • Tariff of Kameng indicated above are provisional as mutually agreed with the beneficiaries and the same will be applicable till determination of the respective tariffs by CERC.
  • Tariff for Pare HPSs is escalating tariff based on Government initiative for promotion of Hydro Power. Tariffs for all the other stations are based on the AFCs allowed by the tariff orders for the respective stations for 2019-24 .
  • Tripura’s APPC at present is Rs.4.40 /kWh.