Introduction
Introduction
Panyor Lower Hydro Power Station (formerly Ranganadi Hydro Power Station) is a run-of-the-river scheme with a small pondage to harness the hydro power of Ranganadi River with the Power House located at Hoz, Papum Pare District and the Dam located at Keyi Panyor District, Arunachal Pradesh. The installed capacity of the Plant is 405 MW with a catchment area of 1894 Sq. Km and design head of 304 m.
