Skip to main content
- Project is proposed to be constructed in Joint Venture between NEEPCO and NHPC.
- Project is proposed to be constructed in Joint Venture between NEEPCO and NHPC.
- Joint Venture formed in 2014 between NEEPCO and KSK Energy Ventures Ltd.
- Post TEC recommendation on Environmental flow as per Basin Study Report induced modification in some TEC parameters.
- Site-specific e-flow study undertaken as advised by CEA outcomes of which shall be considered for re-assessment of project parameters subject to approval by MOEF&CC.