Joint Venture Plants

  • Joint Venture formed in 2014 between NEEPCO and KSK Energy Ventures Ltd.
  • Post TEC recommendation on Environmental flow as per Basin Study Report induced modification in some TEC parameters. 
  • Site-specific e-flow study undertaken as advised by CEA outcomes of which shall be considered for re-assessment of project parameters subject to approval by MOEF&CC.