131 |
Maintenance of Existing Road sectionfrom Design Chainage Km 15.940 to Km 33.120 [Total Length = 17.180 (Pkg-II)] of NH-37 in the State of Manipur on Item Rate and work order basis to be carried out at the Risk & Cost of the EPC Contractor
|
Manipur |
23-12-2024 |
|
View Details |
|
132 |
Invitation of EXPRESSION OF INTEREST (EOI) for “Terrestrial site-specific photography/videography of NH-10 Sevoke- Rangpo section from Km 0.000 to 52.100 in the State of West Bengal”
|
West Bengal |
19-12-2024 |
|
View Details |
|
133 |
Consultancy services for preparation of Detailed Project Report and pre-construction activities in respect of construction/ widening of existing carriageway into 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking / sliding zones of section from Pakyong to Barapathing via Gangchung , Tokchi and Machong in the State of Sikkim
|
Sikkim |
19-12-2024 |
|
View Details |
|
134 |
Restoration of road by way of clearance of landslide, surface boulders including construction of R/walls and B/walls and laying of WBM-III & Bituminous Carpeting on Chatroo-Singpora link road from Km 0.000 to 19.600 in the UT of J&K.for FY 2024-25
|
Union Territory of Jammu and Kashmir |
18-12-2024 |
|
View Details |
|
135 |
Providing the Services o fVehicle on Monthly Basis for NHIDCL, Project Monitoring Unit Siliguri in the State of West Bengal
|
West Bengal |
17-12-2024 |
|
View Details |
|
136 |
Emergent slope protection works on valley side for maintenance & upkeep of existing NH-717A between Km 61+180 to 61+266 (Lava-Algarah section) on item rate basis in the State of West Bengal- 2nd Call.
|
West Bengal |
16-12-2024 |
|
View Details |
|
137 |
Providing the Services of Vehicle On Monthly Basis to NHIDCL, Regional Office Gangtok (Sikkim)
|
Sikkim |
14-12-2024 |
|
View Details |
|
138 |
Invitation of Tender For Providing the Services of Vehicle On Monthly Basis to NHIDCL, Regional Office Gangtok (Sikkim)
|
Sikkim |
14-12-2024 |
|
View Details |
|
139 |
Annual Repair and Maintenance work from Brahmakund T-Junction (Km 745+600) to Kamlang T-Junction (Km 770+600) Section of NH-13 & NH-15 (Total Length - 25.000 Km) in the State of Arunachal Pradesh
|
Arunachal Pradesh |
13-12-2024 |
|
View Details |
|
140 |
Annual Repair and Maintenance work from Kamlang T-Junction (Km 770+600) to Chowkham (Km 806+750) section of NH-15 (Total Length - 36.150 Km) in the State of Arunachal Pradesh
|
Arunachal Pradesh |
12-12-2024 |
|
View Details |
|