Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Vacancies
    • Archive
  • Contact
Recruitment Portal

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result of Consultancy Services as Authority’s Engineer for Supervision of Construction of Uni-directional Sudhmahadev – Dranga Twin Tube Tunnel and its approach roads (from D.Ch. 0.00 to D Ch. 12.85) on Chenani – Sudhmahadev – Goha Ro

  • Read more about Technical Evaluation Result of Consultancy Services as Authority’s Engineer for Supervision of Construction of Uni-directional Sudhmahadev – Dranga Twin Tube Tunnel and its approach roads (from D.Ch. 0.00 to D Ch. 12.85) on Chenani – Sudhmahadev – Goha Ro

Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report and for pre-construction activities towards Construction of 4-lane Tunnel Connectivity across river Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH

  • Read more about Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report and for pre-construction activities towards Construction of 4-lane Tunnel Connectivity across river Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH

Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-construction activities for connecting National Waterway – 2 at Dhubri to NH- 127B in the State of Assam. – (3rd Call)

  • Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-construction activities for connecting National Waterway – 2 at Dhubri to NH- 127B in the State of Assam. – (3rd Call)

Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of Construction of Uni Directional Singhpora-Vailoo Tunnel (Under Sinthan pass) and its approach road (of 2-lane with paved shoulder) on Sudhmahdev Goha-Khellani-

  • Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of Construction of Uni Directional Singhpora-Vailoo Tunnel (Under Sinthan pass) and its approach road (of 2-lane with paved shoulder) on Sudhmahdev Goha-Khellani-

Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 10+670 to km 37+550) design length of 26.550 km in the State

  • Read more about Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 10+670 to km 37+550) design length of 26.550 km in the State

Technical Evaluation Result Consultancy services for Authority’s Engineer for supervision of: (i) Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at cr

  • Read more about Technical Evaluation Result Consultancy services for Authority’s Engineer for supervision of: (i) Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at cr

Technical Evaluation Result for Balance Work for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road up to Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99

  • Read more about Technical Evaluation Result for Balance Work for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road up to Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99

Consultancy Services as Authority’s Engineer for Supervision of: i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukia -Makum Bypass of NH-15 (Old NH 37) and Impro

  • Read more about Consultancy Services as Authority’s Engineer for Supervision of: i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukia -Makum Bypass of NH-15 (Old NH 37) and Impro

Technical Evaluation Result RFP for Consultancy Services for Preparation of Inception Report & Detailed Project Report (DPR) for Development of Multi Modal Logistics Park at Udaipur in the State of Tripura under PM Gati Shakti

  • Read more about Technical Evaluation Result RFP for Consultancy Services for Preparation of Inception Report & Detailed Project Report (DPR) for Development of Multi Modal Logistics Park at Udaipur in the State of Tripura under PM Gati Shakti

Technical Evaluation Result of the Consultancy Services for Authority Engineer for Supervision of: i) Widening/Improvement of NH-515 to 4 (Four) Lane with Paved Shoulder from km 0+800 (Kandulijan Gaon) to km 27+701 (Simen Chapori) on NH-515 in the State o

  • Read more about Technical Evaluation Result of the Consultancy Services for Authority Engineer for Supervision of: i) Widening/Improvement of NH-515 to 4 (Four) Lane with Paved Shoulder from km 0+800 (Kandulijan Gaon) to km 27+701 (Simen Chapori) on NH-515 in the State o

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 14
  • Page 15
  • Page 16
  • Page 17
  • Current page 18
  • Page 19
  • Page 20
  • Page 21
  • Page 22
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 15/04/2026

  • Total Visitors: 655032