Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Resource Pool

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.

  • Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.

Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.

  • Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.

Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.

  • Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.

Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.

  • Read more about Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.

Technical Evaluation Result for strengthening works on NH-10 from km. 52.000 to Km 80.000 on Item Rate Contract Basis in the state of Sikkim for FY 2021-22. Dated: 17-05-2021.

  • Read more about Technical Evaluation Result for strengthening works on NH-10 from km. 52.000 to Km 80.000 on Item Rate Contract Basis in the state of Sikkim for FY 2021-22. Dated: 17-05-2021.

Technical Evaluation Result for Restoration and Repairs of NH-39 (new NH-29) from existing Dimapur-Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2021-22 – 2nd Call. Dated: 19-05-2021.

  • Read more about Technical Evaluation Result for Restoration and Repairs of NH-39 (new NH-29) from existing Dimapur-Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2021-22 – 2nd Call. Dated: 19-05-2021.

Technical Evaluation Result for Strengthening from: Km 912.348 to Km 912.780, Km 916.000 to Km 928.000, Km 938.000 to Km 945.400, Km 946.500 to Km 947.300 & Km 947.700 to Km 948.000 of Bilasipara-Tulungia of NH-31 (New NH-17) in the State of Assam in FY 2

  • Read more about Technical Evaluation Result for Strengthening from: Km 912.348 to Km 912.780, Km 916.000 to Km 928.000, Km 938.000 to Km 945.400, Km 946.500 to Km 947.300 & Km 947.700 to Km 948.000 of Bilasipara-Tulungia of NH-31 (New NH-17) in the State of Assam in FY 2

Technical Evaluation Result for Strengthening from: Km 6.180 to Km 7.380 & Km 18.835 to Km 30.675 (Length=13.130 Km) and Km 30.765 to Km 42.000 (Length=11.235) of Bilasipara to Guwahati Section of NH-17 (Old NH-37) in the State of Assam in FY 21-22. Dated

  • Read more about Technical Evaluation Result for Strengthening from: Km 6.180 to Km 7.380 & Km 18.835 to Km 30.675 (Length=13.130 Km) and Km 30.765 to Km 42.000 (Length=11.235) of Bilasipara to Guwahati Section of NH-17 (Old NH-37) in the State of Assam in FY 21-22. Dated

Technical Evaluation Result for Strengthening of the Section from Km 40.300 to Km 42.000 of SilcharVaringte, NH-306 in FY 21-22: Second Call. Dated: 13-05-2021.

  • Read more about Technical Evaluation Result for Strengthening of the Section from Km 40.300 to Km 42.000 of SilcharVaringte, NH-306 in FY 21-22: Second Call. Dated: 13-05-2021.

Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arun

  • Read more about Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arun

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 43
  • Page 44
  • Page 45
  • Page 46
  • Current page 47
  • Page 48
  • Page 49
  • Page 50
  • Page 51
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 22/08/2025

  • Total Visitors: 11634