Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Resource Pool

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Construction of 2 laning with paved shoulder of new greenfield alignment from Helipad at Menla at km 82.000 to Menla at Km 94.030 of Rhenok – Menla spur (NH-717B) Package-IIIB on EPC Basis under SARDP-NE Phase ‘A’ in the St

  • Read more about Technical Evaluation Result for Construction of 2 laning with paved shoulder of new greenfield alignment from Helipad at Menla at km 82.000 to Menla at Km 94.030 of Rhenok – Menla spur (NH-717B) Package-IIIB on EPC Basis under SARDP-NE Phase ‘A’ in the St

Technical Evaluation Result for Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim & Uttarakhand in high altitude remote areas. Dated: 22-12-2020.

  • Read more about Technical Evaluation Result for Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim & Uttarakhand in high altitude remote areas. Dated: 22-12-2020.

Technical Evaluation Result for Construction and Installation of prefabricated Office cum Residence in the States of Himachal Pradesh & Union Territory of Ladakh in high altitude remote areas. Dated: 18-12-2020.

  • Read more about Technical Evaluation Result for Construction and Installation of prefabricated Office cum Residence in the States of Himachal Pradesh & Union Territory of Ladakh in high altitude remote areas. Dated: 18-12-2020.

Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of i) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02)

  • Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of i) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02)

Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of (i) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02)

  • Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of (i) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02)

Technical Evaluation Result for Design, Engineering, Procurement, Supply And Construction For Construction Of Four Lane Bridge Including Approaches Over River Brahmaputra Between Dhubri On North Bank And Phulbari On South Bank In The State Of Assam / Megh

  • Read more about Technical Evaluation Result for Design, Engineering, Procurement, Supply And Construction For Construction Of Four Lane Bridge Including Approaches Over River Brahmaputra Between Dhubri On North Bank And Phulbari On South Bank In The State Of Assam / Megh

Technical Evaluation Result for Selection of Manpower placement agency for providing services of Middle Management Personnel (such as IT, Chartered Accountant, Legal and other professional staff) at NHIDCL Headquarters, New Delhi, its Site Offices, Projec

  • Read more about Technical Evaluation Result for Selection of Manpower placement agency for providing services of Middle Management Personnel (such as IT, Chartered Accountant, Legal and other professional staff) at NHIDCL Headquarters, New Delhi, its Site Offices, Projec

Technical Evaluation Result for CONSTRUCTION OF HIGH ALTITUDE HILL ROAD FROM DOGINALA TO GAU FROM KM 0.000 TO KM 15.320 IN UPPER SUBANSIRI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 16-12-2020.

  • Read more about Technical Evaluation Result for CONSTRUCTION OF HIGH ALTITUDE HILL ROAD FROM DOGINALA TO GAU FROM KM 0.000 TO KM 15.320 IN UPPER SUBANSIRI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 16-12-2020.

Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil sec

  • Read more about Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil sec

Technical Evaluation Result for EOI for Authority’s Engineer for Improvement and Widening to two lane with paved shoulder of Kailashahar – Khowai section of NH-208 in the state of Tripura on Engineering, Procurement Construction (EPC) mode – starting near

  • Read more about Technical Evaluation Result for EOI for Authority’s Engineer for Improvement and Widening to two lane with paved shoulder of Kailashahar – Khowai section of NH-208 in the state of Tripura on Engineering, Procurement Construction (EPC) mode – starting near

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 56
  • Page 57
  • Page 58
  • Page 59
  • Current page 60
  • Page 61
  • Page 62
  • Page 63
  • Page 64
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 26/08/2025

  • Total Visitors: 11662