Technical Evaluation Result for Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP. Dated: 08-09-2020 Read more about Technical Evaluation Result for Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP. Dated: 08-09-2020
Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Pha Read more about Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Pha
Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Pha Read more about Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Pha
Technical Evaluation Result for Empanelment of consultants for Comprehensive Flood Management or River Training works/Canal Works/River Front Development to be carried out in various part of India including J&K- Technical result-reg. Dated: 07-09-2020 Read more about Technical Evaluation Result for Empanelment of consultants for Comprehensive Flood Management or River Training works/Canal Works/River Front Development to be carried out in various part of India including J&K- Technical result-reg. Dated: 07-09-2020
Technical Evaluation Result for Restoration and Repair (R&R) for two lane road of NH-208, from Saikabari to Lentibari (Boarder of Dhalai and Khowai District) (Ch 61.00 Km to Ch 85.200 km) (Total Length=24.200 Km) in the state of Tripura in the FY 2020-21 Read more about Technical Evaluation Result for Restoration and Repair (R&R) for two lane road of NH-208, from Saikabari to Lentibari (Boarder of Dhalai and Khowai District) (Ch 61.00 Km to Ch 85.200 km) (Total Length=24.200 Km) in the state of Tripura in the FY 2020-21
Technical evaluation for Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP.Technical Evaluation Resu Read more about Technical evaluation for Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP.Technical Evaluation Resu
Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with Paved shoulder of NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package -IV (Design Chainage from Km 33+600 to Km 58+840) in the state of Sikkim in EPC mode. Dated: 28-08-2 Read more about Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with Paved shoulder of NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package -IV (Design Chainage from Km 33+600 to Km 58+840) in the state of Sikkim in EPC mode. Dated: 28-08-2
Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from TaphuKuki to Daili section (Pkg 4A) of Imphal-Kohima road (NH-39) (Design Chainage from Km262+175 to Km274+610) in the state of Manipur on EPC Read more about Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from TaphuKuki to Daili section (Pkg 4A) of Imphal-Kohima road (NH-39) (Design Chainage from Km262+175 to Km274+610) in the state of Manipur on EPC
Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated: 27-08-2020. Read more about Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated: 27-08-2020.
Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section (Pkg-4B) of Imphal Kohima Road (NH-39) (Design Chainage from Km 274+610 to Km 287+000) in the state of Manipur on Read more about Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section (Pkg-4B) of Imphal Kohima Road (NH-39) (Design Chainage from Km 274+610 to Km 287+000) in the state of Manipur on