Technical Evaluation Result for Selection of Consultants forAuthority’s Engineer for “Widening and upgradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram from km 8.000 to km 125.000”.. Dated: 0 Read more about Technical Evaluation Result for Selection of Consultants forAuthority’s Engineer for “Widening and upgradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram from km 8.000 to km 125.000”.. Dated: 0
Technical Evaluation Result for Providing & supplying of commercial vehicle 6 Nos. (01 Innova & 05 Bolero or equivalent) on a monthly basis for NHIDCL Branch Office-Jammu in the State of Jammu & Kashmir. Dated: 26-03-19. Read more about Technical Evaluation Result for Providing & supplying of commercial vehicle 6 Nos. (01 Innova & 05 Bolero or equivalent) on a monthly basis for NHIDCL Branch Office-Jammu in the State of Jammu & Kashmir. Dated: 26-03-19.
Technical Evaluation Result for Construction of 48m Bridge over Chuba Khola from Km 75+300 to Km 75+800 on NH-10 in the State of Sikkim on EPC Basis. Dated: 08-03-19. Read more about Technical Evaluation Result for Construction of 48m Bridge over Chuba Khola from Km 75+300 to Km 75+800 on NH-10 in the State of Sikkim on EPC Basis. Dated: 08-03-19.
Technically Qualified result for the Project in the state of Meghalaya from Ranior to Nongjri (Design Length- 33.250km). Dated: 08-03-19. Read more about Technically Qualified result for the Project in the state of Meghalaya from Ranior to Nongjri (Design Length- 33.250km). Dated: 08-03-19.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches in Dharasu-Yamunotri se Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches in Dharasu-Yamunotri se
Financial Bid Opening For Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur on EPC mode.02-03-19. Read more about Financial Bid Opening For Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur on EPC mode.02-03-19.
Technical Evaluation Result for Consultancy Services for institutional strengthening of NHIDCL. 02-03-19 Read more about Technical Evaluation Result for Consultancy Services for institutional strengthening of NHIDCL. 02-03-19
Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing Pre-Construction Services for upgradation to 2 lane with paved shoulder from (i) Km 44.50 to Km 142.00 of Chattroo Village & ( Read more about Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing Pre-Construction Services for upgradation to 2 lane with paved shoulder from (i) Km 44.50 to Km 142.00 of Chattroo Village & (
Technical Evaluation Result for Construction of Two-Lane “Chisopani Traffic Tunnel” of Length 250 m including approaches from Km 67+080 to Km 67+500 on NH-10 in East District of Sikkim State on EPC mode.Dated: 28-02-19. Read more about Technical Evaluation Result for Construction of Two-Lane “Chisopani Traffic Tunnel” of Length 250 m including approaches from Km 67+080 to Km 67+500 on NH-10 in East District of Sikkim State on EPC mode.Dated: 28-02-19.
Technical Evaluation Result for Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Khati Chowk (Km 26.350) of 20.350 Km length in the state of Jammu and Kashmir to be executed on EPC basis. Read more about Technical Evaluation Result for Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Khati Chowk (Km 26.350) of 20.350 Km length in the state of Jammu and Kashmir to be executed on EPC basis.