Opening of Financial Bid for Operation and Maintenance of 2-Lane Bi-Directional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On Dharasu Yamunotri. Dated: 18-12-2018. Read more about Opening of Financial Bid for Operation and Maintenance of 2-Lane Bi-Directional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On Dharasu Yamunotri. Dated: 18-12-2018.
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for the following road stretches in the state of Jammu & Kashmiri)2 Laning of Mughal Road connecting Shopian with Bafliaz in Poonch Read more about Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for the following road stretches in the state of Jammu & Kashmiri)2 Laning of Mughal Road connecting Shopian with Bafliaz in Poonch
Expression of Interest (EOI) for Authority\’s Engineer for Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japa Read more about Expression of Interest (EOI) for Authority\’s Engineer for Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japa
The opening of financial bid for Hunli-Anini AE Project in the state of Arunachal Pradesh.Dated: 03-12-18. Read more about The opening of financial bid for Hunli-Anini AE Project in the state of Arunachal Pradesh.Dated: 03-12-18.
Technical Evaluation Result Construction of Rooftop Cafe at the terrace level of Automated Multilevel Car Parking at Transport Bhawan,1, Parliament Street, New Delhi.Dated: 03-12-18. Read more about Technical Evaluation Result Construction of Rooftop Cafe at the terrace level of Automated Multilevel Car Parking at Transport Bhawan,1, Parliament Street, New Delhi.Dated: 03-12-18.
Technical Evaluation Result Construction and Upgradation including specialized slope treatment of existing road to 2-lane with the paved shoulder from existing km. 458.900 to km. 459.475 (design ch 456.200 to ch 456.800) of Patalganga landslide of NH-07 u Read more about Technical Evaluation Result Construction and Upgradation including specialized slope treatment of existing road to 2-lane with the paved shoulder from existing km. 458.900 to km. 459.475 (design ch 456.200 to ch 456.800) of Patalganga landslide of NH-07 u
Technical Evaluation Result Construction and Upgradation including specialized slope treatment and augment of existing road from Km. 379+100 to Km. 380+275 (approx. 1.175 km) on Gholteer Landslide of National Highway No. 07 (hereinafter called the “NH-07 Read more about Technical Evaluation Result Construction and Upgradation including specialized slope treatment and augment of existing road from Km. 379+100 to Km. 380+275 (approx. 1.175 km) on Gholteer Landslide of National Highway No. 07 (hereinafter called the “NH-07
Financial Bid Opening For Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 0.000 to Km 25.000 (Existing Km 0.000 to Km 25.760) (ii) Design Km 25.000 to Km 50.000 Read more about Financial Bid Opening For Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 0.000 to Km 25.000 (Existing Km 0.000 to Km 25.760) (ii) Design Km 25.000 to Km 50.000
Technical Evaluation Result For Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of “In- Principle” declared NH in the Car Nicobar Island under the Union Territory Read more about Technical Evaluation Result For Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of “In- Principle” declared NH in the Car Nicobar Island under the Union Territory
Technical Evaluation Result For Periodical Renewal for Rangpo-Gangtok section for Km 52+000 to Km 80+000(Excluding Km 63.00 to Km 66.00 and Km 69.00 to Km 72.00) of NH-10 including raising in 200 m length in Sinking area in Km 80 in the state of Sikkim Da Read more about Technical Evaluation Result For Periodical Renewal for Rangpo-Gangtok section for Km 52+000 to Km 80+000(Excluding Km 63.00 to Km 66.00 and Km 69.00 to Km 72.00) of NH-10 including raising in 200 m length in Sinking area in Km 80 in the state of Sikkim Da