Technical Evaluation Result for the Project of Special Repair work between Ranipool to Zero point from km 80.00 to km 93.00 of NH-10 in the State of Sikkim on Item Rate Basis” (Re-tender) Dated : 14-03-2018 Read more about Technical Evaluation Result for the Project of Special Repair work between Ranipool to Zero point from km 80.00 to km 93.00 of NH-10 in the State of Sikkim on Item Rate Basis” (Re-tender) Dated : 14-03-2018
Revised Technical Evaluation Result for the Project of Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement on EPC basis from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118. Read more about Revised Technical Evaluation Result for the Project of Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement on EPC basis from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.
Technical Evaluation Result for the Project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis”. (Retender) Dated : 14-03-2018 Read more about Technical Evaluation Result for the Project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis”. (Retender) Dated : 14-03-2018
Technical Evaluation Result for the Project of “Improvement & Rehabilitation of existing Indira Bye Pass road form Km 0.000 to km 10.117 on NH-10 in the State of Sikkim on Item Rate Basis” (Retender) Dated : 14-03-2018 Read more about Technical Evaluation Result for the Project of “Improvement & Rehabilitation of existing Indira Bye Pass road form Km 0.000 to km 10.117 on NH-10 in the State of Sikkim on Item Rate Basis” (Retender) Dated : 14-03-2018
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 19.900 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER Read more about Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 19.900 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 19.900 TO KM 40.090 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER Read more about Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 19.900 TO KM 40.090 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 40.090 TO KM 65.300 [DESIGN KM. 40.000 TO KM. 62.558] (DESIGN LENGTH – 22.558 KM) IN THE STATE OF NAGALAND UNDE Read more about Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 40.090 TO KM 65.300 [DESIGN KM. 40.000 TO KM. 62.558] (DESIGN LENGTH – 22.558 KM) IN THE STATE OF NAGALAND UNDE
Technical Evaluation Result for the Project of Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement on EPC basis from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to d Read more about Technical Evaluation Result for the Project of Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement on EPC basis from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to d
Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur Read more about Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur
Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur Read more about Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur