Tender Evaluation Result 2020

Sr. No Title Year Document
151 Technical Evaluation Result Consultancy services as Authority’s Engineer for Supervision of “Rehabilitation and Up-gradation to 2 lane with paved shoulders of Seling-Dulte section (Economic Corridor) of NH-6 from Existing chainage Km 0+000 to Km 69+015 (D 2020 Size: 391.75 KB
152 Technical Evaluation Result Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Shinkun La, Tanglang La & Lachalung La in the Union Territ 2020 Size: 12.44 MB
153 Technical Evaluation Result of the tender “M&R works for Akhegwo to Jessami (Aakash Bridge) of NH-202 from Km.283+000 to Km. 326+000, L=43 Km in the State of Nagaland on Item Rate and Work Order Basis. Dated: 21-05-2020. 2020 Size: 459.84 KB
154 Technical Evaluation Result for providing telecom services at NHIDCL Headquarter, Corporate Office, Regional Offices, Project Monitoring Unit and Site Office (Second Call). Dated: 19-05-2020. 2020 Size: 1.68 MB
155 Technical Evaluation Result for Restoration of Road by construction of Pucca Drain in selected stretches from km 0.000 to km 170.000 on Batote -Kishtwar- Sinthan Pass Road on NH-244 in the Union Territory of Jammu & Kashmir. Dated: 15-05-2020. 2020 Size: 1.5 MB
156 Technical Evaluation Result for Beautification of Indira Bye-pass Road from Km 0.000 (Amdo-Golai) to Km 10.117 (Bhojoghari-Phatak) in the state of Sikkim on Item Rate Basis. Dated: 14-05-2020. 2020 Size: 50.48 KB
157 Technical Evaluation Result for Routine maintenance of Changtongya – Longleng road (NH 702 New) from existing km 00.000 to km 29.530 (length 29.530 km) in the State of Nagaland on Item Rate Basis.Dated: 14-05-2020. 2020 Size: 410.78 KB
158 Technical Evaluation Result for Restoration of Road by way of snow clearance, clearance of consolidated slips, surface boulders, side drain, culverts, including the construction of Retaining wall and Breast wall in selected stretches on Goha-Khellani Road 2020 Size: 1.56 MB
159 Technical Evaluation Result for Maintenance of Kohima to Mao, (Nagaland/ Manipur border) section of NH-2 from Km. 185.000 to Km. 212.700, L=27.700 km in the State of Nagaland on Item Rate and Work Order Basis.Dated: 12-05-2020. 2020 Size: 462.24 KB
160 Technical Evaluation Result for Restoration of Road by providing & laying of WBMIII, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works in selected stretches& Fixtures of Road safety Furniture from K. 2020 Size: 974 KB