Tender Evaluation Result 2020

Sr. No Title Year Document
81 Technical Evaluation Result for Improvement/Widening to 2 Lane with Earthen Shoulder of RanikorMaheshkola-Baghmara road section from Kanai – Rongara, existing chainage from km 85+970 to km 102+345 (design Chainage from km 81+100 to km 96+000) design leng 2020 Size: 409.95 KB
82 Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing km 0.00 to km 14.050 2020 Size: 422.78 KB
83 Technical Evaluation Result for Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) of NH -39 (New NH – 02) under Bharatmala NH(O) – TSP in the state of Nagaland in EPC mode. 2020 Size: 7.48 MB
84 Technical Evaluation Result for Part Design, Construction, Operation & Maintenance (For a period of 5 years) of Fully Automatic Multi-level Parking System at Central Civil Secretariat, Itanagar, Arunachal Pradesh. Dated: 28-09-2020. 2020 Size: 5.44 MB
85 Technical Evaluation Result for Consultancy services for (i) preparation of DPR for Development of Self-Sustainable Bus Port at Udaipur (Tripura), Baddi (Himachal Pradesh) and Port Blair (Andaman and Nicobar Islands) (ii) Supervision of Development of Sel 2020 Size: 7.27 MB
86 Technical Evaluation Result for work of Construction of two-lane with hard shoulders of Demwe-Brahmkund section of NH-13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)- NE. Dated: 25-09-2020. 2020 Size: 1.93 MB
87 Technical Evaluation Result for Restoration and Repair of RCC Bridge at Imphal-Jiribam Road of NH-37 at Ch: 132.465 (Old Ch: 137.00) in the state of Manipur in the FY 2020-21. Dated: 24-09-2020. 2020 Size: 274.42 KB
88 Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of (i) Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 7.880 (near Chedama Junction) to existing km 30. 2020 Size: 10.3 MB
89 Technical Evaluation Result for Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km] 2020 Size: 3.41 MB
90 Technical Evaluation Result for Empanelment of consultants for Waste Management consisting of collection, handling, storage and transportation of Municipal Solid Waste to the designated waste processing site. Dated: 22-09-2020. 2020 Size: 1.03 MB