Technical Evaluation Result for the project of Construction of 2-lane with paved shoulder including geometric improvement from Km 0.00 to Km 16.000 of stretch Singtam – Tarku of NH-510 on EPC basis under SARDP –NE Phase ‘A’ in the state of Sikkim. On Engi
2017
Size: 359.9 KB
112
Technical Evaluation Result for the project of Construction of 2-lane with paved shoulder including Geometric improvement from Km 16.000 to Km 32.500 of stretch Tarku – Rabangla of NH-510 on EPC basis under SARDP –NE Phase ‘A’ in the State of Sikkim On En
2017
Size: 359.86 KB
113
Final Technical Evaluation Result for the project of Rehabilitation and up-gradation of Doimukh-Harmuti road from Harmuti Junction (0/00 km) to Khula camp (14/370 km) and Doimukh (0/000 km) to Bagh Tinali (3/100 km) two lane carriageway in the State of As
2017
Size: 545.25 KB
114
Technical Evaluation Result for the project of Rehabilitation and up-gradation of NH-223 from Km 12.0 to 45.0 (Beodnabad -Ferrargunj Section) excluding section between Km 21.0 to Km 28.0,to 2-Lane with hard shoulder in the Union Territory of Andaman & Nic
2017
Size: 433.72 KB
115
Technical Evaluation Result for the project of Construction of Meka-Roing- Hunli from existing km 16 of Roing Hunli Road to km 21.5 of Hunli-Anini Road (total length=74.863 km) to NH double lane specification in Arunachal Pradesh on Engineering Procuremen
2017
Size: 1.87 MB
116
Technical Evaluation Result for the project of Two-Laning of Existing Khupa – Hayuliang – Hawai Road on EPC basis from design Km. 0.000 (Khupa) to Km. 17.000 [Existing Km 95.800 of (Khupa – Hayuliang Road) to Km 8.970 (Hayuliang – Hawai Road)] in the stat
2017
Size: 2.16 MB
117
Technical Evaluation Result for the project of Two-Laning of Existing Hayuliang – Hawai Road on EPC basis from design Km. 17.000 (Khupa) to Km. 34.000 [Existing Km 16.950 to Km 34.310 (Hayuliang – Hawai Road)] in the state of Arunachal Pradesh under SARDP
2017
Size: 2.21 MB
118
Technical Evaluation Result for the project of Two-Laning of Existing Hayuliang – Hawai Road on EPC basis from Design Km. 34.000 to Km. 51.825 [Existing Km 26.625 to Km 45.050 (Hayuliang – Hawai Road)] in the state of Arunachal Pradesh Under SARDP-NE, Pro
2017
Size: 2.16 MB
119
Technical Evaluation Result for the project of Two-Laning of Hayuliang– Hawai bypass Road on EPC basis from design Km. 51.825 to Km. 63.131 Existing Km 45.050 of Hayuliang – Hawai road to Hawai Town in the state of Arunachal Pradesh Under SARDP-NE.
2017
Size: 1.86 MB
120
Technical Evaluation Result for the project of Rehabilitation and up-gradation of Tura-Mankachar road from Mirjumala junction to Mankachar-Silchar Tinali (0/0 to 1/660km) to two lane carriageway in the State of Assam On Engineering, Procurement & Construc