Technical Evaluation Result for Widening and Improvement of Imphal-Moreh section of NH-39 from Km 406.000 to Km 425.411 to Two (2) lane with paved shoulders configuration in the State of Manipur (Package-IV) on Engineering, Procurement & Construction (EPC
2020
Size: 2.66 MB
2
Technical Evaluation Result for Restoration/ Rehabilitation Of Ukhrul To Nagaland Border Via Jessami Road From Km 79.00 To Km 95.00 (Length 16 Km) NH-150 In The State Of Manipur-2nd Call. Dated: 02-01-2021.
2020
Size: 268.68 KB
3
TECHNICAL EVALUATION RESULT FOR CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) WIDENING/IMPROVEMENT TO 4 (FOUR) LANE WITH PAVED SHOULDER FROM KM 66+000 TO KM 81+000 (DESIGN CHAINAGE 65+923 TO 80+930) OF DOKMOKA – LORINGTHEPI SECTION
2020
Size: 2.11 MB
4
Technical Evaluation Result for Notice Inviting Expression of Interest (EOI) for Engagement of Agency for Aerial Data Collection and Monitoring of NHIDCL Works Using Drone Technology. Dated: 31-12-2020.
2020
Size: 363.08 KB
5
Technical Evaluation Result for 2nd call for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from TaphuKuki to Daili section (Pkg 4A) of Imphal-Kohima road (
2020
Size: 3.64 MB
6
Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-4th Cal. Dated: 26-12-2020.
2020
Size: 283.4 KB
7
Technical Evaluation Result for Ordinary Repair of NH-08 from Km 422.000 to Km 423.000, Km 437.750 to Km 438.000, Km 438.340 to 443.000, Km 444.000 to Km 445.000 & Km 453.00 to Km 455.000 (Total Length = 8.91 Km) in the state of Tripura in the FY 2020-21
2020
Size: 689.3 KB
8
Technical Evaluation Result for Construction of High Altitude Hill road from Taksing to Ghora from KM 0.000 to KM 7.090 in Upper Subansiri District of the state of Arunachal Pradesh on EPC Mode.Dated: 24-12-2020.
2020
Size: 2.5 MB
9
Technical Evaluation Result for Automated Multilevel Tower car parking facility at Aluva Metro station, Kochi, Kerala. Dated: 22-12-2020.
2020
Size: 782.64 KB
10
Technical Evaluation Result for Construction of 2 laning with paved shoulder of new greenfield alignment from Helipad at Menla at km 82.000 to Menla at Km 94.030 of Rhenok – Menla spur (NH-717B) Package-IIIB on EPC Basis under SARDP-NE Phase ‘A’ in the St