Tender Evaluation Result 2020

Sr. No Title Year Document
121 Technical Evaluation Result for Construction and up gradation of existing road to 2-lane with paved shoulder including geometric improvement of section from start of Pedong Bypass to Reshi Border Km 79+700 to Km 96+254 of NH-717A under SARDP-NE Phase ‘A’ 2020 Size: 1.66 MB
122 Opening of Financial Bid for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B (Pkg IA, IB, IIA, IIB, IVA & IVB) in the State of Manipur.Dated: 21-07- 2020 Size: 686.94 KB
123 Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for “construction to 2-Lane Tura Bypass between existing km 95+00 to km 101+00 of NH-51 on EPC mode in the State of Meghalaya. Dated: 21-07-2020. 2020 Size: 428.33 KB
124 Technical Evaluation Result for (i)Construction/ up-gradation of existing road to 2-lane with Paved shoulder from km 40.00 (Kafer) to km 61.100 (Lava More) of the Kafer to Reshi border section of NH-717A on EPC Basis under SARDP-NE Phase A in the State of 2020 Size: 3.07 MB
125 Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Rehabilitation and up-gradation of road from design km 0.000 to km 16.290 (Total length: 16.290 km) of Manu-Lalchara section on NH 44A to two lane with pa 2020 Size: 628.96 KB
126 Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 0.00 to km 36.460 (Package-I, II & III) of Kailashahar – Kurti Bridge section on NH 208 A to two lanes with paved shoulder (ii) Rehabilitation and up- gradation of road 2020 Size: 578.96 KB
127 Technical Evaluation Result forRequest for Proposal for Empanelment of consultants for the Augmentation of Water Supply Scheme including distribution network/Retrofitting and Rehabilitation of the existing water supply network in various parts of India in 2020 Size: 1.66 MB
128 Technical Evaluation Result for Construction of Hnathial bypass (Package-2) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assista 2020 Size: 1.5 MB
129 Technical Evaluation Result for Construction of Lawngtlai bypass (Package-3) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assist 2020 Size: 398.91 KB
130 Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing Km 0.00 to Km 14.050 and 2020 Size: 1.06 MB