Technical Evaluation Result for Consultancy Services for Identification & Preparation of Detailed Project Report for Slope Protection work on Hill & Valley Side, Sinking Zones and Bridges in between Km 368.000 to Km 468.000 (NH-07), in the State of Uttara
2021
Size: 5.42 MB
22
Technical Evaluation Result for Restoration & Repair by way installing and construction of Road safety Item viz. Retaining wall, Breast/wall, Metallic Crash Barrier, Retroreflective Sign Board, Overhead Signs/Gantry Sign Board from Km 0.000 to Km 45.00 on
2021
Size: 90.43 KB
23
Technical Evaluation Result for Restoration & Repair by way installing and construction of Road safety Item viz. Retaining wall, Breast/wall, Metallic Crash Barrier, Retroreflective Sign Board, Overhead Signs/Gantry Sign Board from Km 0.000 to Km 45.00 on
2021
Size: 1.89 MB
24
Technical Evaluation Result for Restoration & Repair by way installing and construction of Road safety Item viz. Retaining wall, Breast/wall, Metallic Crash Barrier, Retroreflective Sign Board, Overhead Signs/Gantry Sign Board from Km 0.000 to Km 45.00 on
2021
Size: 6.81 MB
25
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF FOLLOWING PROJECTS IN THE UNION TERRITORY OF LADAKH. (i) Up-gradation to Intermediate lane of NH-301 Kargil-Zanskar road from km 87.000 to km 98.524 in the UT
2021
Size: 2.14 MB
26
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka Dimapur stretch from km 113+300 to km 146+250 (Design Chainage 113+830 to 145+712) of
2021
Size: 2.43 MB
27
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka Dimapur stretch from km 113+300 to km 146+250 (Design Chainage 113+830 to 145+712) of
2021
Size: 3.34 MB
28
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode-2nd Call. Dated: 11-10-2021.
2021
Size: 2.66 MB
29
Technical Evaluation Result for Restoration & Rehabilitation of NH -37 of Imphal-Jiribam Road (Km 145.00 to Km 221.138) [Total Length = 76.138 km] in the state of Manipur in the year 2021-2022 (3 rd Call). Dated: 08-10-2021.
2021
Size: 224.33 KB
30
Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021.