Technical Evaluation Result for Restoration of road by way of clearance of landslides, Snow including construction of R/Wall, B/Wall and laying of WBM-III, BM and BC on Chatroo-Singpora road From km 0.000 to km 19.600 in the UT of Jammu & Kashmir for FY 2
2022
Size: 5.51 MB
32
Technical Evaluation Result for Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri – Phulbari Bridge approach (Package-II) of Srirampur – Dhubri Section of
2022
Size: 698.53 KB
33
Technical Evaluation Result for Repair and Maintenance of National Highway (NH-40) (Ch. km 81+740 to km 93+490, Ch. Km 123+800 to km Ch 131+820, Ch km 151+330 to 163+400) along the existing road in the State of Meghalaya for the FY 2022-23 (Item Rate
2022
Size: 706.4 KB
34
Technical Evaluation Result for Restoration & Rehabilitation of Road from Km 21.00 to Km 28.00 on NH-4 (old NH-233) in the Union Territory of Andaman & Nicobar Islands in the FY 2022-23 on EPC Basis. Dated : 25-07-2022.
2022
Size: 1.91 MB
35
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Jessami to Akhegwo (Package-1 & 2) from (Design Chainage 283+000 Km to 325+440 Km to 340+160 Km) in the State o
2022
Size: 309.14 KB
36
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of Two lanning with Hard Shoulder Road of Ukhrul – Toloi – Tadbui section of NH-102A from Design Chainage 50.850 km to 81.870 km (Package-3)
2022
Size: 528.26 KB
37
Technical Evaluation Result for award of contract for disposal of old/obsolete furniture and other items of National Highways & Infrastructure Development Corporation Ltd (NHIDCL) Corporate Office, 3rd Floor of PTI Building, New Delhi. Dated : 19-07-2022.
2022
Size: 260.59 KB
38
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF i) Up-gradation to two lane with Paved shoulder from Km. 12+850 to Km.20+300 of 7.450 Km. length on Goha-Khellani section and a link road to Goha Village of 2.
2022
Size: 310.41 KB
39
Revised Technical Evaluation Result for Four Laning of Jhanji to Demow from Km. 491.050 to Km. 535.250 of NH-37 in the state of Assam under SARDP on Engineering Procurement and Construction (EPC) Mode. Dated : 13-07-2022.
2022
Size: 297.39 KB
40
Technical Evaluation Result for Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri – Phulbari Bridge approach (Package-II) of Srirampur – Dhubri Section of