61 |
ACTE-XXIV-200 CPPP Tender Id 2021_DIT_643371_1 Supply of EMI Receiver with LISN, Accessories, Software at ETDC, Chennai |
13-08-2021 |
13-09-2021 |
Size: 336.91 KB |
62 |
Outsourcing of Non-comprehensive Annual Maintenance of Air conditioner unit at ERTL(W), Mumbai |
06-08-2021 |
07-09-2021 |
Size: 927.03 KB |
63 |
Annual subscription of IEC, ISO/IEC JTC-1 and BIS standards |
29-06-2021 |
27-07-2021 |
Size: 1.4 MB |
64 |
38(3)/2K21/ERTL(N)/S&C/Condemnation/01 |
16-04-2021 |
15-06-2021 |
Size: 134.29 KB |
65 |
ERTL(S)/EQPT/20-21/01 |
29-04-2021 |
30-04-2021 |
Size: 485.44 KB |
66 |
ERTL(S)/EQPT/20-21/01 |
22-02-2021 |
30-03-2021 |
Size: 1.18 MB |
67 |
CETE/M/2019/11/01 |
03-03-2021 |
30-03-2021 |
Size: 625.23 KB |
68 |
8(05)/20-21/ERTL(N)/GA-BorewellWater |
26-02-2021 |
18-03-2021 |
Size: 207.67 KB |
69 |
[CPPP Tender Id: 2020_DIT_602663_1] Extension of Bid Submission End Date, for supply of EMI Receiver/Analyzer with LISN at ETDC, Chennai |
06-01-2021 |
29-01-2021 |
Size: 24.16 KB |
70 |
[CPPP Tender Id:2020_DIT_600180_1] Supply of 3-Ph Portable Reference Standard integrated with Voltage & Current Source at ETDC, Chennai Corrigendum Tender |
01-12-2020 |
22-01-2021 |
Size: 24.36 KB |