231 |
RFP for Widening & Upgradation to 4-lane with paved shoulder from km 0.000 (Near Sursunoo village on NH-44) to km 16.700 (End of Seer Hamdan Bypass), Package-IA of Khanabal- Pahalgam- Chandanwadi- Baltal section of NH-501 in the UT of Jammu & Kashmir on EPC mode - reg.
|
Union Territory of Jammu and Kashmir |
01-06-2024 |
|
View Details |
|
232 |
RFP for Consultancy Services as Authority’s Engineer for Supervision of “Construction of Automated Multilevel Parking (Puzzle & Rotary System) at (i)Tehsil Office, Haridwar (ii) Lalita Rao Park, Haridwar (iii) Magistrate Office, Haridwar (iv) Ranipur to Tibri Underpass, Haridwar (v) Tehsil Office, Roorkee (vi) At near National Hotel Tallital, Nainital including of Operation & Maintenance in the State of Uttarakhand on EPC Mode (as a deposit work of State Govt of Uttarakhand)”
|
Uttarakhand |
29-05-2024 |
|
View Details |
|
233 |
RFP for Balance Work Four-laning from Km. 123.840 to Km. 138.775 (Existing km 124.100 to 140.000) Excluding Dimapur & Kohima Bypass in the state of Nagaland on Item Rate & Work Order basis at the Risk & Cost of EPC Contractor
|
Nagaland |
28-05-2024 |
|
View Details |
|
234 |
RFP for Appointment of Safety Consultant for Construction, Operation & Maintenance of Z-Morh tunnel including approaches on Srinagar Sonamarg section connecting National Highway no. 1 in the UT of J&K on DBFOT annuity basis
|
Union Territory of Jammu and Kashmir |
24-05-2024 |
|
View Details |
|
235 |
RFP for Short Term Maintenance Contract of Peren - Dimapur Section on NH-129A from existing Km 120.500 to Km 123.380 Design Km 120.320 to Km 123.200 Length 2.88 Km in the state of Nagaland in FY 2024-25 Percentage Rate and work Order Basis 2nd Call.
|
Nagaland |
24-05-2024 |
|
View Details |
|
236 |
RFP for Consultancy Services for Preparation of Detailed Project Report for Slope Protection and Slope Stabilization works including Rock-fall Protection and Landslide Mitigation measures from km 123.840 to km 166.700 of NH-29 on 4-laning of Dimapur-Kohima road under SARDP-NE in the State of Nagaland
|
Nagaland |
23-05-2024 |
|
View Details |
|
237 |
RFP for Independent Engineer services for supervision of Four laning of Silchar (near Nutan Dayapur village) – Budha Nagar Section under Package: SJ-1 of NH-37 from Existing km 260+000 (D. Ch.4+560) to Existing km 233+000 (D. Ch. 24+560) in the State of Assam under Bharatmala Pariyojna on Hybrid Annuity Mode.
|
Assam |
20-05-2024 |
|
View Details |
|
238 |
RFP for Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg- IV: Structures & Toll Plaza under SARDP- NE , under EPC Mode in the state of Assam.
|
Assam |
20-05-2024 |
|
View Details |
|
239 |
RFP for Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg- IV: Structures & Toll Plaza under SARDP- NE , under EPC Mode in the state of Assam.
|
Assam |
20-05-2024 |
|
View Details |
|
240 |
RFP for Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-II: Road Works from Km 501+800 to Km 514+800 (13.000 Km), under SARDP- NE, under EPC Mode in the state of Assam.
|
Assam |
20-05-2024 |
|
View Details |
|