1 |
Construction of 2-laning with Hard shoulder of Peren-Dimapur section of NH129A from Design Km 173.850 to Km 190.850 (Length – 17.000 Km) in the State of Nagaland on EPC mode (Package-V) under NH (O)-TSP
|
Nagaland |
25-07-2025 |
|
View Details |
|
2 |
Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services in respect to (a) Up gradation of existing 2L+PS of Agartala-Udaipur section to 4L+PS from Km 6.800 to Km 55.00 of NH-08 and (b) Development/ upgradation of Udaipur (NH-08) to Amarpur (Approx. length = 24 Km) in the State of Tripura on EPC basis
|
Tripura |
24-07-2025 |
|
View Details |
|
3 |
Special Repair work on NH-208 from Km 75.700 to Km 101.30 (Total Length – 25.600 Km) at various sections i.e, Srirampur to Khowai section at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis
|
Tripura |
15-07-2025 |
|
View Details |
25-07-2025 |
4 |
Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Reshi to Rhenock from Ch. 96.254 to Ch. 101.554 along NH-717A in the State of Sikkim on EPC mode (2nd call)
|
Sikkim |
14-07-2025 |
|
View Details |
|
5 |
Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Construction of 4-Lane with Paved Shoulder from Phulbari (Meghalaya) to Shillong in the State of Meghalaya.
|
Meghalaya |
10-07-2025 |
|
View Details |
|
6 |
Repair & Restoration of Two-laning of existing Akajan-Likabali-Bame road on item rate basis from Design km 12.00 to km 33.00 (Total Length =21 Km) on Akajan-Likabali-Bame Road (Package-1) Section in the state of Arunachal Pradesh.
|
Arunachal Pradesh |
09-07-2025 |
|
View Details |
|
7 |
Short Term Maintenance Contract (STMC) from km 6.800 to km 55.00 0 (Total length 48.200 km) on road Agartala to Udaipur (NH-08) in the State of Tripura in the FY 2025- 26 on percentage basis and work order basis.
|
Tripura |
08-07-2025 |
|
View Details |
|
8 |
Special & Emergent Repair through Short Term Maintenance Contract o n NH-08 in between Mungiakami to Champaknagar section for undertaking of protection works from Km 42 9+600 to Km 429+695, Km 426+80 0 to Km 426+833, Km 427+650 to K m 427+680, Km 434+300 to Km 434 +370, Km 444+900 to Km 444+930, Km 445+100 to Km 445+130, Km 4 48+300 to Km 448+310, Km 454+2 00 to Km 454+220 & Km 456+300 t o Km 456+315 along with construction of roadside embankment from Km 434+300 to Km 434+360 & Km 445+600 to Km 445+680 in the state of Tripura in the FY 2025-26 on percentage basis and work order basis
|
Tripura |
07-07-2025 |
|
View Details |
|
9 |
Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder from Lavamore to Start of Pedong Bypass along NH-717A from km 61.100 to km 79.700 in the State of West Bengal on EPC Mode (2nd Call)
|
West Bengal |
07-07-2025 |
|
View Details |
|
10 |
Consultancy Services for preparation of Detailed Project Report for Consultancy Services for Preparation of Detailed Project Report for Construction of 4-Lane Access Controlled High Speed Corridor starting from Siliguri to Guwahati and connecting Jorabat in the States of West Bengal and Assam
|
Sikkim |
03-07-2025 |
|
View Details |
|