Financial Bid Opening Letter for the project of Short Term Improvement & Routine Maintenance of Km 51.00 to Km 93.00 of NH-10 in the State of Sikkim (Including Indra and Northern Bypass) on Percentage Rate basis.
2017
Size: 327.75 KB
102
Technical Evaluation Score for the project of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from design Km. 20+000 to Km. 32+050 [Existing Km 20.000 to Km 35.150] in the state of Arunachal Pradesh under SARDP-NE” on EPC Mode
2017
Size: 7.09 MB
103
Technical Evaluation Score for the project of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from design Km. 32+050 to Km. 44+000 [Existing Km 35.150 to Km 50.050] in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement &
2017
Size: 7.09 MB
104
Technical Evaluation Score for the project of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from design Km. 44+000 to Km. 59+363 [Existing Km 50.000 to Km 70.000] in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement &
2017
Size: 5.57 MB
105
Technical Evaluation Score for the project of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from existing Km 70.000 to Km 88.700 (design Km. 59+363 to Km. 77+363) in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement &
2017
Size: 3.1 MB
106
Technical Evaluation Score for the project of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from existing Km 88.700 to Km 104.850 (design Km. 77+363 to Km. 92+363) in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement &
2017
Size: 2.66 MB
107
Technical Evaluation Score for the project of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from existing Km 104.850 to Km 122.600 (design Km. 92+363 to Km. 107+363) in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement
2017
Size: 2.71 MB
108
Technical Evaluation Score for the project of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from existing Km 122.600 to Km 138.000 (design Km. 107+363 to Km. 122+353) in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procuremen
2017
Size: 2.67 MB
109
Technical Evaluation Score for the project of Construction of two-Lane with paved shoulders of Joram-Koloriang Raod (NH-713) on EPC basis from existing Km 138.00 to Km 158.00 [ Design Km. 122.353 to Km. 138.389] (Design Length – 16.036 KM) int he state of
2017
Size: 4.93 MB
110
Technical Evaluation Score for the project of Consultancy Services for Authority’s Engineer for Supervision of Construction of Four/Six laning from Km 132.375 to Km 158.058 (Total New Alignment length of 20.683 Km) of Daboka Dimapur Section (Dimapur Bypas