Tender Evaluation Result 2017

Sr. No Title Year Document
51 Final Technical Evaluation result for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of 2 laning of (i) Maram-Peren-Dimapur section on NH 12 2017 Size: 579.61 KB
52 Technical Evaluation result for the project of Construction of Road, Bridge and Slope Protection Works of Landslide at Bareti (Ex.km 100.300 to Km 101.60 of NH-34) in the State of Uttarakhand on EPC basis. Dated : 11-09-2017 2017 Size: 394.62 KB
53 Technical Score for the Project Of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two- Laning of Existing Khupa – Hayuliang – Hawai Road on EPC basis from (i) design Km. 0.000 (Khupa) to Km. 17.000 [Existing Km 95.800 of 2017 Size: 1.38 MB
54 Financial Evaluation result for the project of Selection of NGO to assist in resettlement plan implementation for IMPHAL – MOREH road in the state of Manipur. Dated : 05-09-2017 2017 Size: 442.41 KB
55 New Technical Evaluation result for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of 2 laning of (i) Maram-Peren-Dimapur section on NH 129A 2017 Size: 679.05 KB
56 Technical Evaluation result for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of (i) 2 laning with paved shoulder of Churachandpur -Tuivai 2017 Size: 588.86 KB
57 Technical Evaluation result for the project of Rehabilitation of existing Churachandpur-Singhat- Tuvai road on NH-102 B between km. 103.10 to Km. 161.48 (length 58.38 km.) in the state of Manipur on EPC basis (2nd call). Dated : 25-08-2017 2017 Size: 1.17 MB
58 Technical Evaluation result for the project of CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR (i) Construction of (i) 154m span Steel Superstructure Bridge at Km 145.09 over River Barak and (ii) 122 m span Steel Superstructure Bridge at Km 189.80 over 2017 Size: 539.39 KB
59 Technical Evaluation result for the project of CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR (i) Rehabilitation and Up-gradation of Beodnabad – Ferrargunj Section of NH-223 (New NH-4) from Km 12.0 to Km 45.0 (excluding Km 21.0 to Km 28.0), to 2-Lane w 2017 Size: 550.06 KB
60 Technical Evaluation result for the project of Selection of NGO to assist in resettlement plan implementation for IMPHAL – MOREH road in the state of Manipur. Dated: 18-08-2017 2017 Size: 4.03 MB