Tender Evaluation Result 2017

Sr. No Title Year Document
31 Modified Technical Evaluation Score for the project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the state of Assam (Package 3) D 2017 Size: 509.64 KB
32 Technical Evaluation Result for the project of Consultancy Services for Authority’s Engineer for Supervision of “Four laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE, Phase A. Da 2017 Size: 414.55 KB
33 Technical Evaluation Result for the project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from (i) design Km. 77+363 to Km. 92+363 [existing Km 88.700 to Km 2017 Size: 1.79 MB
34 Technical Evaluation Result for the project of Consultancy Services for Authority Engineer for Supervision of “ Construction of Two-Laning of Akajan – Likabali- Bame Road on EPC basis from existing Km 71.000 to 99.000 (design Km. 65.810 to Km. 91.928) in 2017 Size: 1.86 MB
35 Technical Evaluation Result for the project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Meka-Roing-Hunli from existing Km 16 of Roing Hunli Road to Km 21.5 of Hunli-Anini Road (Total Length = 74.863 Km) to NH doubl 2017 Size: 2.32 MB
36 Technical Evaluation Result for the project of Four Laning of Balachera to Harangajo section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode. Dated: 27-09-2017 2017 Size: 366.61 KB
37 Technical Evaluation Result for the project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the UT of Andaman & Nicobar Islands. Dat 2017 Size: 452.56 KB
38 Technical Evaluation Result for the project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in North Eastern Region (NER) (Package 1). 2017 Size: 378.2 KB
39 Technical Evaluation Result for the project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the UT of Andaman & Nicobar Islands. Dat 2017 Size: 452.56 KB
40 Technical Evaluation Result for the project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in North Eastern Region (NER) (Package 1). 2017 Size: 378.2 KB