Tender Evaluation Result 2018

Sr. No Title Year Document
71 Technical Evaluation Result for the Project of Urgent repairs of Hiller Bridge in District Anantnag on Kishtwar Sinthanpass – Khanabal Road, NH-244 in the state of Jammu & Kashmir. Dated : 06-04-2018 2018 Size: 413.19 KB
72 Technical Evaluation Result for the Project of Demolition of collapsed Bidhar bridge at km 229.530 on Sinthanpass Khanabal section of NH-244 in the State of Jammu & Kashmir. Dated : 06-04-2018 2018 Size: 342.07 KB
73 Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 100.345 TO KM 122.250 [DESIGN KM. 95.000 TO KM. 115.534] (DESIGN LENGTH – 25.534 KM) IN THE STATE OF NAGA 2018 Size: 1.55 MB
74 Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 79.040 TO KM 100.345 [DESIGN KM. 75.000 TO KM. 95.000 (DESIGN LENGTH – 20.000 KM) IN THE STATE OF NAGALAN 2018 Size: 1.67 MB
75 Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 41.065 TO KM 60.345 [DESIGN KM. 40.000 TO KM. 59.000] (DESIGN LENGTH – 19.00 KM) IN THE STATE OF NAGALAN 2018 Size: 1006.09 KB
76 Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 60.345 TO KM 98.065 [DESIGN KM. 59.000 TO KM. 86.835] (DESIGN LENGTH – 27.835 KM) IN THE STATE OF NAGALA 2018 Size: 1014.25 KB
77 Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur 2018 Size: 364.81 KB
78 Revised Technical Evaluation Result for the Project of REQUEST FOR PROPOSAL (RFP) FOR “WIDENING TO 2-LANE WITH GEOMETRIC IMPROVEMENTS OF TURA DALU ROAD FROM KM 85.000 TO 95.000 & 101.000 TO 145.000 TO 2-LANES WITH PAVED SHOULDER OF TURA–DALU SECTION OF NH 2018 Size: 2.07 MB
79 Final Evaluation Result for the Project of Improvement & Rehabilitation of existing Indira Bye Pass road form Km 0.000 to km 10.117 on NH-10 in the State of Sikkim on Item Rate Basis (Retender). Dated : 22-03-2018 2018 Size: 313.83 KB
80 Technical Evaluation Result for the Project of WIDENING TO 2-LANE WITH GEOMETRIC IMPROVEMENTS OF TURA DALU ROAD FROM KM 85.000 TO 95.000 & 101.000 TO 145.000 TO 2-LANES WITH PAVED SHOULDER OF TURA–DALU SECTION OF NH-51 IN THE STATE OF MEGHALAYA WITH JAPA 2018 Size: 846.72 KB