Technical Result for the Project of Special Repair Works At Narrow zone and Landslide Area Between Rangpo and Ranipool on NH-10 in the State of Sikkim on EPC Basis. Dated : 20-03-2018
2018
Size: 361.14 KB
82
Final Technical Score for the Project of Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities: (i) For construction of Approach Roads with Avalanche Protection Works to West and East portal of the propo
2018
Size: 311 KB
83
Technical Result for the Project of Widening and upgradation to 2 lane with paved shoulder configuration and geometric improvement from km 0.000 to km 16.990 on Chenani – Sudhmahadev section of NH-244 in the State of Jammu & Kashmir On EPC Mode. Dated : 2
2018
Size: 571.4 KB
84
Revised Technical Evaluation Result for the Project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis. Dated : 20-03-2018
2018
Size: 320.44 KB
85
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 52.370 TO KM 79.040 [DESIGN KM. 50.000 TO KM. 75.000] (DESIGN LENGTH – 25.000 KM) IN THE STATE OF NAGALA
2018
Size: 2.54 MB
86
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 25.760 [DESIGN KM. 00.000 TO KM. 25.000] (DESIGN LENGTH – 25.00 KM) IN THE STATE OF NAGALAND
2018
Size: 1.96 MB
87
Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur
2018
Size: 340.91 KB
88
Technical Result for the Project of Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 399.000 to Km. 430.000 of Karanpyarag to Chamoli (Excluding Km 420.250 to Km 420.500 and Km 423.300 to km 423.650) of NH-07 under Chard
2018
Size: 333.31 KB
89
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 20.456 TO KM 41.065 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAN
2018
Size: 1.37 MB
90
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 25.760 TO KM 52.370 [DESIGN KM. 25.000 TO KM. 50.000] (DESIGN LENGTH – 25.00 KM) IN THE STATE OF NAGALAN