Technical evaluation result for Authority’s Engineer for Widening to 2-lane with Geometric Improvements of Tura Dalu road from km 85.000 to 95.000 & 101.000 to 145.000 to 2-Lanes with paved shoulder of Tura–Dalu section of NH-51 in the State of Meghalaya
2019
Size: 741.12 KB
12
Technical evaluation result for Four-lane Bridge including approaches over river Brahmaputra between Dhubri on North Bank and Phulbari on South Bank on NH-127B (Design length 19.282 km) in the State of Assam/ Meghalaya under the scheme of’ North-East Road
2019
Size: 329.8 KB
13
Technical evaluation result for Consultancy Services for Authority’s Engineer for Supervision of “Improvement/Widening to 2 Laning with earthen shoulder of Stretch from Ranikor to Nongrji existing km 0.000 to km 31.700 (Design Length- 33.250 km) in the St
2019
Size: 768.31 KB
14
Technical evaluation result for Construction, Operation and Maintenance of Z-Morh Tunnel including approaches on National Highway no. 1 (Srinagar Sonmarg Gumri Road) in the state of J&K on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis
2019
Size: 375.19 KB
15
Technical evaluation result for 2-laning with earthen shoulders from Ranikor (Khadpra) to Nongjri from Ch. 0.00 to Ch. 31.700 (Design length-33.250 km). Dated: 28-06-2019.
2019
Size: 484.8 KB
16
Technical Evaluation Result For Miscellaneous work of Automated Multilevel Car Parking Project at Transport Bhawan,1, Parliament Street, New Delhi-110001 . Dated : 25-06-2019.
2019
Size: 1.01 MB
17
Technical evaluation result for Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) on EPC mode-Retender. dated: 23-05-19.
2019
Size: 413.59 KB
18
Technical evaluation result for One Time Improvement of Moran Town section of NH -37 from km 555.000 to km 558.500 in the state of Assam . dated: 06-05-19.
2019
Size: 295.03 KB
19
Technical evaluation result for One Time Improvement of Digboi to Ledo Town section (via Powai and Margherita) of NH -38 from km 20.000 to km 53.000 in the state of Assam. dated: 06-05-19.
2019
Size: 308.47 KB
20
Technical evaluation result for the Authority’s Engineer for NH-51, Tura-Dalu road project in the state of Meghalaya. Dated: 24-04-19.