Tender Evaluation Result 2019

Sr. No Title Year Document
21 Technical Evaluation Result for Selection of Consultants for Authority’s Engineer for “Widening and upgradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram from km 250.000 to km 380.000”.. Dated 2019 Size: 722.84 KB
22 Technical Evaluation Result for Selection of Consultants for Authority’s Engineer for “Widening and upgradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram from km 125.000 to km 250.000”.. Dated: 2019 Size: 354.97 KB
23 Technical Evaluation Result for Selection of Consultants forAuthority’s Engineer for “Widening and upgradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram from km 8.000 to km 125.000”.. Dated: 0 2019 Size: 353.3 KB
24 Technical Evaluation Result for Providing & supplying of commercial vehicle 6 Nos. (01 Innova & 05 Bolero or equivalent) on a monthly basis for NHIDCL Branch Office-Jammu in the State of Jammu & Kashmir. Dated: 26-03-19. 2019 Size: 722.84 KB
25 Technical Evaluation Result for Construction of 48m Bridge over Chuba Khola from Km 75+300 to Km 75+800 on NH-10 in the State of Sikkim on EPC Basis. Dated: 08-03-19. 2019 Size: 311.91 KB
26 Technically Qualified result for the Project in the state of Meghalaya from Ranior to Nongjri (Design Length- 33.250km). Dated: 08-03-19. 2019 Size: 884.78 KB
27 Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches in Dharasu-Yamunotri se 2019 Size: 26.02 MB
28 Financial Bid Opening For Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur on EPC mode.02-03-19. 2019 Size: 320.89 KB
29 Technical Evaluation Result for Consultancy Services for institutional strengthening of NHIDCL. 02-03-19 2019 Size: 314.36 KB
30 Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing Pre-Construction Services for upgradation to 2 lane with paved shoulder from (i) Km 44.50 to Km 142.00 of Chattroo Village & ( 2019 Size: 432.56 KB