Tender Evaluation Result 2020

Sr. No Title Year Document
31 Technical Evaluation Result for INSTRUCTIONS TO TENDERERS and FORM OF TENDER for PART DESIGN, CONSTRUCTION, OPERATION & MAINTENANCE (For a Period of 5 Years) OF FULLY AUTOMATIC MULTI-LEVEL CAR PARKING SYSTEM AT CENTRAL CIVIL SECRETARIAT, ITANAGAR, ARUNACH 2020 Size: 930.96 KB
32 Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing km 0.00 to km 14.050 2020 Size: 1.85 MB
33 Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Construction and Upgradation of existing road to 2- lane with paved shoulder configuration of Rhenok – Menla spur (NH-717B) on EPC Mode under SARDP-NE Phase 2020 Size: 404.19 KB
34 Technical Evaluation Result for Special repair of NH 702-D, Mokokchung-Mariani Road (from Km 0.000 to 63.000 Km) [Total length – 63.00 Km] in the state of Nagaland for the FY 2020-21- 2nd Call. Dated: 26-11-2020. 2020 Size: 834.73 KB
35 Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the UT of Jammu and Kashmir. Dated: 25-11-2020. 2020 Size: 671.23 KB
36 Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the State of Meghalaya. Dated: 24-11-2020. 2020 Size: 378.93 KB
37 Technical Evaluation Result for the work of Improvement and widening to two lane with paved shoulder of road from Km 63.700 to Km 75.700 (Total length: 12.000 km) i.e. Bamanchara – Srirampur section of NH-208 (Package-IV) in the state of Tripura on EPC ba 2020 Size: 452.28 KB
38 Technical Evaluation Result for the work of Improvement and widening to two-lane with paved shoulder of road from km 21.100 to km 29.200(Total length:8.100km) i.e. Kailashahar-Fultali section of NH-208(Package-I) in the state of Tripura on EPC basis. Date 2020 Size: 435.19 KB
39 Technical Evaluation Result for the work of Improvement and widening to two-lane with paved shoulder of road from Km 29.200 to Km 49.200 (Total length: 20.000 km) i.e. Fultali – Jurichhara section of NH-208 (Package-II) in the state of Tripura on EPC basi 2020 Size: 471.03 KB
40 Technical Evaluation Result for the work of Improvement and widening to two lane with paved shoulder of road from Km 75.700 to Km 101.300 (Total length: 25.600 km) i.e. Srirampur – Khowai section of NH-208 (Package-V) in the state of Tripura on EPC basis. 2020 Size: 448.75 KB