Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021.
2021
Size: 115.61 KB
32
Technical Evaluation Result for Rehabilitation and Upgradation of Nongstoin-Rambrai- Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” in the state of Meghalaya on EPC mode (Package-I).. Dated: 06-10
2021
Size: 555.79 KB
33
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+
2021
Size: 2.48 MB
34
Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office a
2021
Size: 99.16 KB
35
Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office a
2021
Size: 300.71 KB
36
Technical Evaluation Result for Award of rate contract for repair and maintenance (including supply of requisite materials/part) of office furniture & fixture and day to day items, plumbing, carpentry work, etc. at National Highways Infrastructure Develop
2021
37
Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna
2021
Size: 663.26 KB
38
Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna
2021
Size: 1.53 MB
39
Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Aruna
2021
Size: 2.73 MB
40
Technical Evaluation Result for Restoration and Repairs (R&R)/Strengthening to Single Lane with Earthen Shoulder of Srirampur to Dhubri section of Newly declared NH-127B (old Village road) from Existing Km 7.700 to Km 24.400 (Gossaigaon- Tamahat Road),