Tender Evaluation Result 2021

Sr. No Title Year Document
71 Final Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of “Upgradation to 2 lane with Paved shoulders of Tuivai – Keifang road, NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 (Bridg 2021 Size: 1.85 MB
72 Technical Evaluation Result for Detailed survey of various roads under RO Srinagar using Network Survey Vehicle (NSV) in the UT of Jammu & Kashmir. Dated: 23-08-2021. 2021 Size: 3.76 MB
73 Technical Evaluation Result for Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on EPC mode. Dated: 18-08-2021. 2021 Size: 3.76 MB
74 Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 101.280 Km (Existing Chainage km 67.496 to Km 103.557) (PKG-4) in the State of Manipur on Engineering, Pro 2021 Size: 8.49 MB
75 Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) Construction & Upgradation to 2 lane with paved shoulder from Design Km. 67.805 (at the end of Km 83rd tunnel near Dhrabshala) to Km 80.675 (Dulhasti) of 1 2021 Size: 2.09 MB
76 Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of “Upgradation to 2 lane with Paved shoulders of Tuivai – Keifang road, NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 (Bridge acro 2021 Size: 1.52 MB
77 Technical Evaluation Result for Construction, Supply, Transportation, Installation, Testing and Commissioning of Steel Pontoons and Gangways using suitable Steel Enveloped HDPE / FRP floating material for providing floating Terminal facilities at various 2021 Size: 1001.65 KB
78 Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh.(Package 5: Khanabal- Baltal). Dated: 13-08-2021. 2021 Size: 4.24 MB
79 Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 4: Lamayuru-Leh). Dated: 13-08-2021. 2021 Size: 2.85 MB
80 Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 3: Kargil-Lamayuru). Dated: 13-08-2021. 2021 Size: 2.73 MB