Tender Evaluation Result 2023

Sr. No Title Year Document
131 Technical Evaluation Result for Consultancy Services for Carrying out Feasibility Studies (FS) and preparation of Feasibility Report in respect of “Up-gradation & Widening of road to two lane with paved shoulders from Hilli (West Bengal) to Mahendraganj ( 2023 Size: 309.02 KB
132 Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and pre- construction activities in respect of “Widening of existing carriageway into 2-lane with paved shoulder configuration and Several slope protection wo 2023 Size: 383.67 KB
133 Technical Evaluation Result for and Widening to two lane with earthen/paved shoulder from Km 23 to Km 34.500 (11.5 Km) and overlay from Km 20.30 to Km 22.00 (1.7 Km) (Total Length = 13.2 Km) o. Dated : 06-02-2023. 2023 Size: 333.56 KB
134 Technical Evaluation Result for Construction of Uni-directional Singhpora – Vailoo Tunnel (Under Sinthanpass) of length 10.331km/10.363km (Tube-1/Tube-2)and its approach road from Km 111+067 (at Chhatroo km 140.870 on NH-244) to 149+678(at vailoo Juncti 2023 Size: 354.58 KB
135 Technical Evaluation Result for empanelment of Aviation Agency for hiring of fixed and rotary wing aircraft. Dated : 24-01-2023. 2023 Size: 291.61 KB
136 Technical Evaluation Result for WIDENING TO 2 (TWO) LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-I (DESIGN CHAINAGE 0+000 KM TO 34+975 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE. Dated : 17-01-2023. 2023 Size: 340.7 KB
137 Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-II (Design Chainage 34+795 Km to 69+875 Km) in the State of Nagaland on EPC mode under NH (O)-NE. Dated : 17-01-2023. 2023 Size: 328.03 KB
138 Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-III (Design Chainage 69+875 Km to 106+816 Km) in the State of Nagaland on EPC mode under NH (O)-NE. Dated : 17-01-2023. 2023 Size: 646.39 KB
139 Technical Evaluation Result for CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF KOHIMA BYPASS ROAD CONNECTING NH-39 (NEWNH-02),NH-150 (NEW NH-02), NH-61(NEW NH-29) AND NH-39 (NEWNH-02) FROM DESIGN KM21.000 TO DESIGN KM 32.268 [DESIGN LENGTH 11.268 KM IN T 2023 Size: 599.25 KB
140 Technical Evaluation Result for CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF KOHIMA- BYPASS ROAD CONNECTING NH-39 (NEW NH-02), NH-150(NEW NH-02), NH- 61(NEW NH-29) AND NH-39 (NEW NH-02) FROM DESIGN KM 0.00 TO DESIGN KM 10.500 [DESIGN LENGTH – 10.500 K 2023 Size: 568.84 KB