Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukhia -Makum Bypass of NH-15 (OLD NH-37) and Strengthening of existing NH-315 (OLD NH
2023
Size: 641.64 KB
142
Technical Evaluation Result for Improvement/ Widening to 2-lane with paved shoulder/4-laning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki bridge from km 131+820 to km 151+330 (design km 45+760 to km 63+530) Design length
2023
Size: 345.63 KB
143
Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/Manipur Border) at km 96.870 and ending near Hangrum at km 116.550 (Packa
2023
Size: 597.51 KB
144
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ram- Mandir to Arrowa section of NH-113 from Design Km 0.000 to Km 2.910 (Existing Km 65.080 to Km 67.990) of total length 2.755 km excluding Tidding Bridge (155 m) in t
2023
Size: 540.12 KB
145
Technical Evaluation Result for Improvement/ Widening to 2-lane with paved shoulder/4-laning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki bridge from km 131+820 to km 151+330 (design km 45+760 to km 63+530) Design length
2023
Size: 345.63 KB
146
Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/Manipur Border) at km 96.870 and ending near Hangrum at km 116.550 (Packa
2023
Size: 597.51 KB
147
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ram- Mandir to Arrowa section of NH-113 from Design Km 0.000 to Km 2.910 (Existing Km 65.080 to Km 67.990) of total length 2.755 km excluding Tidding Bridge (155 m) in t