Technical Evaluation Result for Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 80.000 to Km 170.000 (Kishtwar – Chatroo) on Batote-Kis
2018
Size: 444.8 KB
2
Technical Evaluation Result for invitation of RFP for DPR consultancy services for western bypass. Dated: 27-12-18.
2018
Size: 404 KB
3
Opening of financial bid for Hunli-Anini AE Project in the state of Arunachal Pradesh.Dated: 27-12-18.
2018
Size: 385.86 KB
4
Financial Bid Opening For Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 50.000 to Km 75.000 (Existing Km 52.370 to Km 79.040) (ii) Design Km 75.000 to Km 95.00
2018
Size: 410 KB
5
Technical Evaluation result for Consultancy Service for Authority’s Engineer for (i) Construction of alternative highway (Package-IVA from 0.00 to 13.00 of Bagrakot-Kafer section of NH-717A on EPC mode in state of West Bengal (ii) Construction of alterna
2018
Size: 595.56 KB
6
Technical Evaluation result for “Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 166.00 to km 208.00 (Package-4) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procureme
2018
Size: 436.34 KB
7
Technical Evaluation result for “Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 208.00 to km 250.00 (Package-5) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procuremen
2018
Size: 436.36 KB
8
Technical Evaluation result for Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 298.00 to km 339.00 (Package-7) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement
2018
Size: 457.45 KB
9
Opening of Financial Bid for Operation and Maintenance of 2-Lane Bi-Directional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On Dharasu Yamunotri. Dated: 18-12-2018.
2018
Size: 2.71 MB
10
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for the following road stretches in the state of Jammu & Kashmiri)2 Laning of Mughal Road connecting Shopian with Bafliaz in Poonch