Technical Evaluation result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways (Guwahati-Jorabat bypass) in the state of Assam. Dated: 22
2018
Size: 347.03 KB
22
Technical Evaluation Result of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamunotri se
2018
Size: 4.46 MB
23
Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 80.000 to 123.600 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
2018
Size: 1.75 MB
24
Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 25.000 to 80.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
2018
Size: 1.9 MB
25
Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 123.600 to 170.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
2018
Size: 1.78 MB
26
Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 0.000 to 25.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
2018
Size: 1.81 MB
27
Opening of Financial Bids for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Pfutsero-Phek Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 19.900) (ii) Design Km 20.0
2018
Size: 1.84 MB
28
Technical Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamuno
2018
Size: 18.08 MB
29
Technical Score For The Project of Consultancy Services for Authority’s Engineer for – (i) Construction and Upgradation of existing road to 2-lane with paved shoulder from Km. 368.000 to Km. 399.000 of Lameri to Karanprayag (Excluding Km. 379.100 to Km 38
2018
Size: 15.36 MB
30
Technical Score For The Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Pfutsero-Phek Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 19.900) (ii) Design Km 20.000 to Km 4