Sr. No Title Year Document
51 Revised Technical Evaluation Result for the Project of Consultancy services for Authority’s Engineer for Supervision of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) and Two Lanin 2018 Size: 345.16 KB
52 Technical Evaluation Result for the Project of Restoration/Reconstruction of Churachandpur-Tipaimukh road from km 185.00 (Bukpi) to Km 262.00 (Tipaimukh) in the state of Manipur on EPC mode. Dated : 12-06-2018 2018 Size: 339.38 KB
53 Technical Evaluation Result for the Project of Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Nagaland under Bharatmala 2018 Size: 377.59 KB
54 1st Stage Evaluation Result for the Project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Tharthri-Kahaljugasar-Kilhotran 2018 Size: 421.75 KB
55 Technical Evaluation Result for the Project of Two Laning of Imphal – Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur (Contract Package II) under Engineering Procurement and Construction (EPC) Mode Dated : 01-06-2018 2018 Size: 629.65 KB
56 Technical Evaluation Result for the Project of Fixing of Main and Intermediate Boundary Pillars for demarcation of ROW along NH-54 (2-Lane with paved shoulder) from km 8.00 to km 380.00 in the State of Mizoram. Dated : 30-05-2018 2018 Size: 615.4 KB
57 Revised Technical Evaluation Result for the Project of Construction, Operation and Maintenance of 2-Lane BiDirectional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On DharasuYamunotri Section Between Ch. 25.400 Km And Ch. 51.000 2018 Size: 676.97 KB
58 Technical Evaluation Result for the Project of Selection Of Consultants/ Ngos To Assist In Implementation Of Resettlement Action Plan For : Widening to Two lane with Geometric Improvements of Tura Dalu road from Km 85.00 to 95.00 & 101.00 to 145.00 to 2-l 2018 Size: 418.98 KB
59 Technical Evaluation Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Pfutsero-Phek Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 19.900) (ii) Design Km 20 2018 Size: 9.39 MB
60 Technical Evaluation Result for the Project of Construction, Operation and Maintenance of 2-Lane BiDirectional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On DharasuYamunotri Section Between Ch. 25.400 Km And Ch. 51.000 Km Fall 2018 Size: 994.2 KB