Technical Score for the Project of Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities: (i) For construction of Approach Roads with Avalanche Protection Works to West and East portal of the proposed Zo
2018
Size: 298.22 KB
112
Technical Result for the Project of Rehabilitation and up-gradation of section from Km 107.760 to Km 129.445 (After Middle strait to Humphrey), Km 130.600 to Km 138 (After Humphrey to Kadamtala) & Km 155.00 to Km 181.0 (End of Jarwa to Rangat) of NH-4 (To
2018
Size: 322.83 KB
113
Technical Evaluation Result for the Project of 2 LANING OF EXISTING HUNLI-ANINI FROM DESIGN KM 120.000 TO KM 130.300 (TOTAL LENGTH =10.300 KMS) IN THE STATE OF ARUNACHAL PRADESH ON EPC BASIS UNDER SARDP-NE ON EPC MODE. Dated : 06-03-2018
2018
Size: 2.32 MB
114
Technical Evaluation Result for the Project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1)
2018
Size: 323.73 KB
115
Technical Evaluation Result for the Project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1)
2018
Size: 346.25 KB
116
Final Evaluation Result for the Project of Consultancy Services for Authority‟s Engineer for Supervision of “Four laning of Balachera to Harangajao section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode”. Dated : 09-02-2018
2018
Size: 726.57 KB
117
Modified Technical Result for the Project of Restoration of Road by way of clearance of landslide, surface boulders side drain, culverts including construction of R/wall/Scuppers and laying of WBM-II, WBM-III, & Pre- Mixed Surfacing/Mixed seal Surfacing (
2018
Size: 406.75 KB
118
Revised Technical Evaluation Result for the Project of Consultancy Services for Authority‟s Engineer for Supervision of “Four laning of Balachera to Harangajao section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode. Dated :
2018
Size: 302.91 KB
119
Technical Evaluation Result Cancellation Notice for the Project of Special Repair work between Ranipool to Zero point from km 80.00 to km 93.00 of NH-10 in the State of Sikkim on Item Rate Basis. Dated : 30-01-2018
2018
Size: 329.31 KB
120
Technical Result for the Project of Restoration of Road by way of clearance of landslide, surface boulders side drain, culverts including construction of R/wall/Scuppers and laying of WBM-II, WBM-III, & Pre- Mixed Surfacing/Mixed seal Surfacing (PC) on Ba