Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km (Design Ch.84.100km to Ch.96.000km) of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Pac
2021
Size: 2.26 MB
162
Technical Evaluation Result for Construction of Kishtwar bypass with 2 lane with paved shoulder from Design Km. 80.675 (Dulhasti) to Km 95.550 (bandarkoot ) of 14.88 Km length on Khellani – Kishtwar –Chattroo section and a link road to Kishtwar town of 1.
2021
Size: 494.12 KB
163
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5 starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km 113+330 (Design KM 96+400 to Km 11
2021
Size: 2.14 MB
164
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 131+500 to Km 146+250 (Design Chainage 131+152 to 145+712) of Manja – Dillai Section (Package-7) of NH 29 in the state of Assam on EPC mode. Dated: 28-03-202
2021
Size: 2.31 MB
165
Technical Evaluation Result for Construction of two lane with paved shoulders road from Tamenglong to Mahur in the state of Manipur from km 10.000 near Dialong Village to km 21.900 near Old Tamenglong Village (Length- 11.90 km) (Package-2A) on EPC mode.
2021
Size: 3.16 MB
166
Technical Evaluation Result for Construction of two lane with paved shoulders road from Tamenglong to Mahur in the state of Manipur from km 10.000 near Dialong Village to km 21.900 near Old Tamenglong Village (Length- 11.90 km) (Package-2A) on EPC mode.
2021
Size: 1.54 MB
167
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 83.800 Km (Total length= 17.69 Km) (PKG-5) in the State of Manipur on Engineering, Procurement & Constr
2021
Size: 1.04 MB
168
Technical Evaluation Result for CONSTRUCTION OF BALANCE WORK OF TWO – LANE WITH HARD SHOULDERS OF EXISTING HAYULIANG – HAWAI ROAD (NH-113) FROM DESIGN KM 51.825 TO KM 63.131 (EXISTING KM 45.050 OF HAYULIANG – HAWAI ROAD TO HAWAI TOWN)(11.306 KM) ON EPC BA
2021
Size: 1.02 MB
169
Technical Evaluation Result for CONSTRUCTION OF BALANCE WORK OF TWO – LANE WITH HARD SHOULDERS OF EXISTING HAYULIANG – HAWAI ROAD (NH-113) FROM DESIGN KM 51.825 TO KM 63.131 (EXISTING KM 45.050 OF HAYULIANG – HAWAI ROAD TO HAWAI TOWN)(11.306 KM) ON EPC BA
2021
Size: 3.62 MB
170
Revised Technical Evaluation Result-II for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 84.800 to km 111.580 (Package-III) in the State of Mizoram under Bharatmala Pariyoj