Tender Evaluation Result 2021

Sr. No Title Year Document
181 Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilkhuthi section (Pkg-5B) of Imphal Kohima Road (Design Chainage from Km 297+700 to Km 308+460) of NH-39 in the state of Manipur on 2021 Size: 601.95 KB
182 Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilkhuthi section (Pkg-5B) of Imphal Kohima Road (Design Chainage from Km 297+700 to Km 308+460) of NH-39 in the state of Manipur on 2021 Size: 2.16 MB
183 Technical Evaluation Result for Construction /Up gradation 2 lane with paved shoulder from Design Km 95.55 (Bandarkoot ) to Km. 111.08 (Chattroo) of 15.54 Km length on Khellani – Kishtwar – Chattroo section on NH-244 in the Union Territory of Jammu & Kash 2021 Size: 613.95 KB
184 Technical Evaluation Result for Construction of 2-laning with hard shoulder configuration of Chhumkhum to Tlabung from Design Chainage Km 37.420 to Km 74.950 [Pkg-B] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojan 2021 Size: 2.39 MB
185 Technical Evaluation Result for construction of 2-laning with hard shoulder configuration of Lunglei to Chhumkhum from Design Chainage Km 0.000 (Hrangchalkawn) to Km 37.420 [Pkg-A] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bhara 2021 Size: 2.48 MB
186 Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 20.500 at Old Tamenglong to km 30.800 ending near Phelong (Length-10.3km) (PKG-3) on EPC mode. Dated: 25-03-2021 2021 Size: 1.93 MB
187 Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length=17.180 Km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construct 2021 Size: 2.84 MB
188 Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length=17.180 Km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construct 2021 Size: 2.45 MB
189 Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length=17.180 Km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construct 2021 Size: 2.4 MB
190 Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 51+246to Km 66+000 (Design Chainage 50+710 to 65+923) of Parokhuwa – Dokmoka Section (Package 2) of NH 29 in the state of Assam on EPC mode. Dated: 24-03-202 2021 Size: 2.69 MB