Salient Aspects Of Power Supply 

  • The generating stations deliver power ex-power plant to the regional / state grids through their respective switchyards.
  • Power is transmitted to the bulk consumers through the transmission systems of Powergrid Corporation of India Limited or the respective State Transmission Utilities.
  • Secure, stable and integrated operation of the NER Power System is ensured by NERLDC in its role as Grid Manager.

Generating Stations, Beneficiaries & Tariff: 

Power StationInstalled Capicity (MW)Station CodNormative Tariff (Rs./kwh)Beneficiaries
Khandong Hydro Power Station(KhPS)2x25=5004.05.19841.828Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, and Tripura
Kopili Hydro Power Station(KHPS)4x50=200

Tariff

Availability Based tariff

The Availability Based Tariff (ABT) came into force in the North Eastern Region with effect from 1st November, 2003. Under the ABT regime the generator has to declare its generation availability on day-to-day basis to the RLDC. The beneficiaries have to submit their requisitions on daily basis. The RLDC draws up the daily injection and drawal schedules on the basis of the capacity declarations and requisitions.

Commercial Activities

The Primary Functions Of The Commercial Department are:

1. POWER SALE & POWER PURCHASE AGREEMENTS (PPA)