81 |
Quotation for Detailed Survey using (i) MASW (Multi-Channel Analysis of Surface Waves), (ii) ERT (Electrical Resistivity Tomography) Technique and (iii) Contour Map of the area indicated with a yellow rectangle for Cracks developed on the carriageway and breast wall at Ch. 65+950 (approx.) in the month of August 2024 within the vicinity and downhill of the slope of Tlakshi village on Kanchanpur-Vaghmun section of NH-44A (Package-III)
|
Tripura |
11-03-2025 |
b1b0d |
View Details |
|
82 |
Short term Maintenance Work for the year 2024-25 & 2025-26 for the stretch 26.00 Kmp (Lukbheer) to 52.10 km (Rangpo) of NH-10 in the State of West Bengal on item rate basis – 2 nd CALL
|
West Bengal |
10-03-2025 |
af93f |
View Details |
|
83 |
Shifting of 33 kV and 11 kV electrical utilities and the construction of power lines along NH-4 from Km155.00 to Km181.00 (from the end of Jarawa to Rangat) in the Baratang and Rangat feeder areas of Middle Andaman, in the Union Territory of Andaman and Nicobar Islands, based on percentage rate basis
|
Union Territory of Jammu and Kashmir |
10-03-2025 |
4b681 |
View Details |
|
84 |
Short Term Maintenance Contract of NH-29 Kohima-Jessami Road Pkg-II from Design Km 29.600 to Km. 51.500 Total Length: 21.900 Km. Kohima and Phek in the State of Nagaland in the FY 2024-25 Percentage Rate and work order basis at Risk and Cost of the EPC Contractor.
|
Nagaland |
03-03-2025 |
c8c6a |
View Details |
|
85 |
EXPRESSION OF INTEREST (EOI) for “Road Safety Audit for the work of “Construction of 2-lane with paved shoulder including geometric improvement from km 16.00 to km 32.50 of stretch Tarku-Rabangla of NH-510 on EPC Basis under SARDP- NE Phase \\\'A\\\' in
|
Sikkim |
01-03-2025 |
72356 |
View Details |
|
86 |
Construction of Multipurpose Hall for 300 people sitting capacity with the roof having the features of truss frame’s structure, tin sheet roofing and false ceilings at DPL Choglamsar for Ladakh Police, in UT of Ladakh
|
Union Territory of Jammu and Kashmir |
27-02-2025 |
7f507 |
View Details |
|
87 |
Short Term Maintenance Contract for Protection of hill slope and Restoration of approach road of 4-laning of Dimapur-Kohima section on NH-29 from Km 142+400 to Km 142+450 in the state of Nagaland in FY: 2024-25 (Percentage Rate and work Order Basis)
|
Nagaland |
24-02-2025 |
111c9 |
View Details |
|
88 |
Short Term Maintenance Contract for Restoration of 4-laning of Dimapur-Kohima section on NH-29 from Km 126+600 to Km 126+800 in the state of Nagaland in FY: 2024- 25 (Percentage Rate and work Order Basis) at the Risk & Cost of EPC Contractor
|
Nagaland |
24-02-2025 |
21e6e |
View Details |
|
89 |
Widening to 2-lane with paved shoulder along with specialized slope protection works in vulnerable sinking/ sliding zones from Km 0.000 to 52.100of NH-10 (Sevoke-Rangpo section)in the State of West Bengal
|
West Bengal |
24-02-2025 |
|
View Details |
|
90 |
Consultancy services for preparation of Detailed Project Report and pre-construction activities in respect of construction/ widening of existing carriageway into 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking / sliding zones of section from Pakyong to Barapathing via Gangchung , Tokchi and Machong in the State of Sikkim
|
Sikkim |
21-02-2025 |
4f381 |
View Details |
|