61 |
Short Term maintenance for Restoration of Breach of formation on valley side & Slope Protection works at Tangni-I (from Km. 454+650 to km. 454+800) and Tangni-II (from Km. 455+260 to Km. 455+300) on NH-07 in the state of Uttarakhand under M&R.
|
Uttarakhand |
28-03-2025 |
0c913 |
View Details |
|
62 |
Short Term maintenance Contract (STMC) for NH-02 of Imphal-Kohima Road from design Ch. km 287.000 (Sapermaina) to km 290.350 (Kholep) [Total Length = 3.350 km] in the state of Manipur in the year 2024-25 on Item Rate Basis (2nd Call)
|
Manipur |
28-03-2025 |
01314 |
View Details |
|
63 |
Providing the Services of Vehicle On Monthly Basis to NHIDCL, SO-Ravangla (Sikkim)
|
Sikkim |
27-03-2025 |
00179 |
View Details |
|
64 |
Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Reshi to Rhenock from Ch. 96.254 to Ch. 101.554 along NH-717A in the State of Sikkim on EPC mode
|
Sikkim |
26-03-2025 |
c291c |
View Details |
|
65 |
SELECTION OF CONSULTANTs/ NGOs TO ASSIST IN IMPLEMENTATION OF RESETTLEMENT ACTION PLAN FOR: Improvement & Widening to two lane with paved shoulder of road from km 101.300 (Khowai) to km 236.213 (Harina) (Total length = 134.913 km) of NH-208 in the State of Tripura on Engineering Procurement & Construction (EPC) basis under Japan International Cooperation Agency (JICA) Official Development Assistance (ODA) Loan.
|
Tripura |
26-03-2025 |
22994 |
View Details |
|
66 |
One Time improvement under Restoration & Repair of Ukhrul Town Road from km 0 to km 9(Length-9 km) of NH-102A Ukhrul-Toloi-Tadubi Road in the State of Manipur in FY-2024-2025 on EPC mode(2nd Call)- International Competitive Bidding
|
Manipur |
26-03-2025 |
5fc9f |
View Details |
|
67 |
Project Management Consultancy Services for Widening to 2-lane with paved shoulder along with specialized slope protection works in vulnerable sinking/ sliding zones from Km 0.000 to 52.100of NH-10 (Sevoke-Rangpo section) in the State of West Bengal
|
West Bengal |
24-03-2025 |
850c3 |
View Details |
|
68 |
Short Term Maintenance for Temporary Mitigation Measures, including Toe Protection Works at Nandprayag Landslide Location (from Km 418.998 to Km 419.068 & from Km. 419.113 To Km. 419.223) on NH-07, in the State of Uttarakhand under M&R.
|
Uttarakhand |
21-03-2025 |
b2432 |
View Details |
|
69 |
Specialized Slope Protection Work of Section from Km. 25.600 to Km. 26.100 (Bagrakot - Kafer) of NH - 717 A in the State of West Bengal on EPC mode (Pkg-IVC)
|
West Bengal |
20-03-2025 |
c87ad |
View Details |
|
70 |
Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder from Lavamore to Start of Pedong Bypass along NH-717A from existing km 61.100 to km 79.700 in the State of West Bengal on EPC Mode
|
West Bengal |
20-03-2025 |
c7083 |
View Details |
|