Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Resource Pool

Breadcrumb

  1. Home
  2. Node
 BACK

CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i)4-laning of Dimapur – Kohima Road from design km 123.840 to km 138.775 (Existing km 124.100 to km 140.000) (Package-I), (ii) 4-laning of Dimapur – Kohima Road from design km 138.775 to k

  • Read more about CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i)4-laning of Dimapur – Kohima Road from design km 123.840 to km 138.775 (Existing km 124.100 to km 140.000) (Package-I), (ii) 4-laning of Dimapur – Kohima Road from design km 138.775 to k

CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg –

  • Read more about CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg –

Technical Evluation Result for Construction for Mitigation Measures of 05 Nos. Landslides, 05 Nos. Sinking Zones and 1 no. Bridge from Ch. 450.00 to Ch. 468.00 (18 Km. length) on NH-07 on EPC mode in the State of Uttarakhand (Package-III).

  • Read more about Technical Evluation Result for Construction for Mitigation Measures of 05 Nos. Landslides, 05 Nos. Sinking Zones and 1 no. Bridge from Ch. 450.00 to Ch. 468.00 (18 Km. length) on NH-07 on EPC mode in the State of Uttarakhand (Package-III).

Technical Evaluation Result for Construction for Mitigation Measures of 05 Nos. Landslides, 05 Nos. Sinking Zones from Ch. 433.00 to Ch. 450.00 (17 Km. length) on NH-07 on EPC mode in the State of Uttarakhand (Package-II).

  • Read more about Technical Evaluation Result for Construction for Mitigation Measures of 05 Nos. Landslides, 05 Nos. Sinking Zones from Ch. 433.00 to Ch. 450.00 (17 Km. length) on NH-07 on EPC mode in the State of Uttarakhand (Package-II).

Technical Evaluation Result for Construction for mitigation measures of 10 nos. of Landslides, 01 no. Sinking Zone and 01 no. minor bridge from Km 386.000 to Km 433.000 (65 km length) on NH-07 on EPC mode in the State of Uttarakhand, PKG-I.

  • Read more about Technical Evaluation Result for Construction for mitigation measures of 10 nos. of Landslides, 01 no. Sinking Zone and 01 no. minor bridge from Km 386.000 to Km 433.000 (65 km length) on NH-07 on EPC mode in the State of Uttarakhand, PKG-I.

Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunach

  • Read more about Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunach

Technical Evaluation Result for Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Package-2) on Sairang – Phaibawk section of NH-6 in the State of Mizoram on EPC Mode..

  • Read more about Technical Evaluation Result for Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Package-2) on Sairang – Phaibawk section of NH-6 in the State of Mizoram on EPC Mode..

Technical Evaluation Result for for Consultancy Services as Authority’s Engineer for Supervision of: i) Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/M

  • Read more about Technical Evaluation Result for for Consultancy Services as Authority’s Engineer for Supervision of: i) Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/M

Technical Evaluation Result for Widening/Improvement to 4 lane with paved shoulder from Ch. 5.580 km to Ch. 25.633 km (Design Ch. 0.000 km to Ch. 17.737 km) for Package-1 of Bilasipura – Guwahati Road (NH-17) (Section: Near Chirakuta to near Mowatari, bef

  • Read more about Technical Evaluation Result for Widening/Improvement to 4 lane with paved shoulder from Ch. 5.580 km to Ch. 25.633 km (Design Ch. 0.000 km to Ch. 17.737 km) for Package-1 of Bilasipura – Guwahati Road (NH-17) (Section: Near Chirakuta to near Mowatari, bef

Technical Evaluation Result Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-I) from Design Km 0.000 to Km 53.000 (Design Length 53.000 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Prade

  • Read more about Technical Evaluation Result Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-I) from Design Km 0.000 to Km 53.000 (Design Length 53.000 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Prade

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 111
  • Page 112
  • Page 113
  • Page 114
  • Current page 115
  • Page 116
  • Page 117
  • Page 118
  • Page 119
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 26/09/2025