Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Basam-Thathi-Amaha and Bruni-Lama Camp-Kangri’ Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length: Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Basam-Thathi-Amaha and Bruni-Lama Camp-Kangri’ Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length:
Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunach Read more about Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunach
Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunach Read more about Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunach
Technical Evaluation Result for Construction of Balance Work of 4-laning of NH-37 from End of Moran Bypass (561.700) to Bogibeel Junction near Lapetketa (580.875): Pkg-II: Structures, under SARDP-NE Read more about Technical Evaluation Result for Construction of Balance Work of 4-laning of NH-37 from End of Moran Bypass (561.700) to Bogibeel Junction near Lapetketa (580.875): Pkg-II: Structures, under SARDP-NE
Technical Evaluation Result for Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 13+080(Total length:13.080 km) of Tuting Zido section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode Project o Read more about Technical Evaluation Result for Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 13+080(Total length:13.080 km) of Tuting Zido section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode Project o
Technical Evaluation Result for for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-I) from Design Km 0.000 to Km 53.000 (Design Length 53.000 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunach Read more about Technical Evaluation Result for for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-I) from Design Km 0.000 to Km 53.000 (Design Length 53.000 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunach
Technical Evaluation Result for Widening/Improvement to 2-lane with earthen shoulder of Finch Corner to Ukhrul section from existing km 34+650 to km 50+520 (Design Chainage km 30+970 to km 45+600) of NH-202 in the State of Manipur on EPC mode. (Package-3, Read more about Technical Evaluation Result for Widening/Improvement to 2-lane with earthen shoulder of Finch Corner to Ukhrul section from existing km 34+650 to km 50+520 (Design Chainage km 30+970 to km 45+600) of NH-202 in the State of Manipur on EPC mode. (Package-3,
Technical Evaluation Result for Construction of Balance Work of 4-laning of NH-37 from End of Moran Bypass (561.700) to Bogibeel Junction near Lapetketa (580.875): Pkg-I: Road works & Toll Plaza, under SARDP-NE Read more about Technical Evaluation Result for Construction of Balance Work of 4-laning of NH-37 from End of Moran Bypass (561.700) to Bogibeel Junction near Lapetketa (580.875): Pkg-I: Road works & Toll Plaza, under SARDP-NE
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Near Mowatari, befor Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Near Mowatari, befor
Technical evaluation Result for 4 (Four) Laning and Greenfield alignment of Karimganj – Silchar section of NH-37 from Design chainage 0.000 (Near ISBT, Silchar bypass) to Km. 15.970 (Kalinagar Pt I on NH-37) in the state of Assam on HAM mode. Package –I ( Read more about Technical evaluation Result for 4 (Four) Laning and Greenfield alignment of Karimganj – Silchar section of NH-37 from Design chainage 0.000 (Near ISBT, Silchar bypass) to Km. 15.970 (Kalinagar Pt I on NH-37) in the state of Assam on HAM mode. Package –I (