Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Resource Pool

Breadcrumb

  1. Home
  2. Node
 BACK

Consultancy Services as Authority’s Engineer for Supervision of Construction of Intermediate Lane of Pango to Jorging Road from Design Km 0+000 to Design Km 40+000 (Design Length: 40.00 Km, Package-I, Greenfield Alignment) in the State of Arunachal Prades

  • Read more about Consultancy Services as Authority’s Engineer for Supervision of Construction of Intermediate Lane of Pango to Jorging Road from Design Km 0+000 to Design Km 40+000 (Design Length: 40.00 Km, Package-I, Greenfield Alignment) in the State of Arunachal Prades

Short Term Maintenance Contract from chainage 174.200 (Tizit) via Pentom Junction – Jaboka – Lahdoigarh – Namtola Charali (Assam), Total length of the said stretch is 4.3 km (Mon) in the State of Nagaland in the FY 2024-25 (Percentage Rate & work order

  • Read more about Short Term Maintenance Contract from chainage 174.200 (Tizit) via Pentom Junction – Jaboka – Lahdoigarh – Namtola Charali (Assam), Total length of the said stretch is 4.3 km (Mon) in the State of Nagaland in the FY 2024-25 (Percentage Rate & work order

Consultancy Services as Authority’s Engineer for Supervision of :- (i) Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 46+704(Total length:46.704 km) of Zido –Singha section on NH-913 (Frontier Highway) in the State of

  • Read more about Consultancy Services as Authority’s Engineer for Supervision of :- (i) Construction of Intermediate Lane Road with hard Shoulder from design Km 0+000 to Km 46+704(Total length:46.704 km) of Zido –Singha section on NH-913 (Frontier Highway) in the State of

CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION of Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0+000 to Ch. 53+040 (Total Design Length = 53.04 Km) of Tato to Manigong Section of NH-913 (Frontier Highway)

  • Read more about CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION of Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0+000 to Ch. 53+040 (Total Design Length = 53.04 Km) of Tato to Manigong Section of NH-913 (Frontier Highway)

CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION of Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0+000 to Ch. 53+040 (Total Design Length = 53.04 Km) of Tato to Manigong Section of NH-913 (Frontier Highway)

  • Read more about CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION of Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0+000 to Ch. 53+040 (Total Design Length = 53.04 Km) of Tato to Manigong Section of NH-913 (Frontier Highway)

Independent Engineer Services for Four Laning of Badarpur – Churaibari section of NH-37 & NH-8 from Design chainage 38.600 (End of proposed Badarpur Bypass) to Km 62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV)

  • Read more about Independent Engineer Services for Four Laning of Badarpur – Churaibari section of NH-37 & NH-8 from Design chainage 38.600 (End of proposed Badarpur Bypass) to Km 62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV)

Independent Engineer services for supervision of Construction of 4 (Four) Lane with Paved Shoulder for existing as well as Greenfield alignment (D. Ch. 87.700 Km to D. Ch. 106.500 Km) of Chandkhira Village – Churaibari Section of NH-8 in the state

  • Read more about Independent Engineer services for supervision of Construction of 4 (Four) Lane with Paved Shoulder for existing as well as Greenfield alignment (D. Ch. 87.700 Km to D. Ch. 106.500 Km) of Chandkhira Village – Churaibari Section of NH-8 in the state

Short Term Maintenance Contract of NH-39 (New NH-02) from Kohima to Mao Stretch (from Km 185.540 to Km 194.000) [Length=8.46 Km] in the State of Nagaland in the FY 2024-25” – Percentage Rate and Work Order Basis, at “Risk and Cost” of EPC Contractor

  • Read more about Short Term Maintenance Contract of NH-39 (New NH-02) from Kohima to Mao Stretch (from Km 185.540 to Km 194.000) [Length=8.46 Km] in the State of Nagaland in the FY 2024-25” – Percentage Rate and Work Order Basis, at “Risk and Cost” of EPC Contractor

Short Term Maintenance Contract of NH39 New NH02 from Kohima to Mao Stretch from Km 194.000 to Km 212.334 Length 18.334 Km in the State of Nagaland in the FY 2024-25 Percentage Rate and Work Order Basis, at Risk and Cost of EPC Contract

  • Read more about Short Term Maintenance Contract of NH39 New NH02 from Kohima to Mao Stretch from Km 194.000 to Km 212.334 Length 18.334 Km in the State of Nagaland in the FY 2024-25 Percentage Rate and Work Order Basis, at Risk and Cost of EPC Contract

Rectification of Black Spots /Accident Prone locations on Batote-Khellani Road stretch by Installation of Metallic Crash Barrier, Road Signages, raising of outer earthen shoulders etc., along with Clearance of landslide & Snow on NH-244 in the UT of Jammu

  • Read more about Rectification of Black Spots /Accident Prone locations on Batote-Khellani Road stretch by Installation of Metallic Crash Barrier, Road Signages, raising of outer earthen shoulders etc., along with Clearance of landslide & Snow on NH-244 in the UT of Jammu

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Current page 6
  • Page 7
  • Page 8
  • Page 9
  • Page 10
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 26/09/2025