Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Resource Pool

Breadcrumb

  1. Home
  2. Node
 BACK

Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg- IV: Structures & Toll Plaza under SARDP- NE , under EPC Mode in the state of Assam.

  • Read more about Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg- IV: Structures & Toll Plaza under SARDP- NE , under EPC Mode in the state of Assam.

Balance work for Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Srirampur (near Bhairiguri Village) to Kachukhana Harichara Paglagaunj (Package-I) of Srirampur – Dhubri Section of NH-127B from e

  • Read more about Balance work for Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Srirampur (near Bhairiguri Village) to Kachukhana Harichara Paglagaunj (Package-I) of Srirampur – Dhubri Section of NH-127B from e

Short Term Maintenance Contract of Dimapur-Kohima Section on NH-29 from old chainage Km 134.650 to Km 134.800 [New Chainage Km 31.462 to Km 31.612 (Length 0.15 Km)] in the state of Nagaland in FY: 2024-25

  • Read more about Short Term Maintenance Contract of Dimapur-Kohima Section on NH-29 from old chainage Km 134.650 to Km 134.800 [New Chainage Km 31.462 to Km 31.612 (Length 0.15 Km)] in the state of Nagaland in FY: 2024-25

Consultancy Services for Preparation of Detailed Project Report for Slope Protection and Slope Stabilization works including Rockfall Protection and Landslide Mitigation measures from km 123.840 to km 166.700 of NH-29 on 4-laning of Dimapur-Kohima Road un

  • Read more about Consultancy Services for Preparation of Detailed Project Report for Slope Protection and Slope Stabilization works including Rockfall Protection and Landslide Mitigation measures from km 123.840 to km 166.700 of NH-29 on 4-laning of Dimapur-Kohima Road un

CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg –

  • Read more about CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg –

Expression of Interest (EOI) for short listing of Consultants for Authority’s Engineer JICA ODA Phase-VI in the state of Tripura

  • Read more about Expression of Interest (EOI) for short listing of Consultants for Authority’s Engineer JICA ODA Phase-VI in the state of Tripura

Consultancy Services for Preparation of Detailed Project Report for intermittent Two Lane plus Paved Shoulder stretches to Four Lane in between Design Km 148+589 (Existing Km 235+070) (Vailoo) to Design Km 176+532 (Existing Km (263+070) Donipawa of 8.643

  • Read more about Consultancy Services for Preparation of Detailed Project Report for intermittent Two Lane plus Paved Shoulder stretches to Four Lane in between Design Km 148+589 (Existing Km 235+070) (Vailoo) to Design Km 176+532 (Existing Km (263+070) Donipawa of 8.643

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “Construction of 2nd Tube Uni-directional Zojila Tunnel (13.14 km) from D.ch. 16.80 to D.Ch. 30.50 of NH-1 in the under UT of Ja

  • Read more about Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “Construction of 2nd Tube Uni-directional Zojila Tunnel (13.14 km) from D.ch. 16.80 to D.Ch. 30.50 of NH-1 in the under UT of Ja

Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-IV: Structures & Toll Plaza, under SARDP- NE, under EPC Mode – Result of Technical Evaluation

  • Read more about Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-IV: Structures & Toll Plaza, under SARDP- NE, under EPC Mode – Result of Technical Evaluation

Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-III: Road Works from Km 514+800 to Km 534+800 (20.000 Km), under SARDP- NE, under EPC Mode – Result of Technical Evaluation

  • Read more about Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 (Old): Pkg-III: Road Works from Km 514+800 to Km 534+800 (20.000 Km), under SARDP- NE, under EPC Mode – Result of Technical Evaluation

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Current page 9
  • Page 10
  • Page 11
  • Page 12
  • Page 13
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 26/09/2025